My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_REVISION - X200521710 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X200521710
>
2013-07-01_REVISION - X200521710 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:07 PM
Creation date
7/3/2013 9:30:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200521710
IBM Index Class Name
REVISION
Doc Date
7/1/2013
Doc Name
Proposed Decision Letter & Cost Estimate
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
SL1
Email Name
ERR
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 001 Page 2 of 2 <br />Dozing method: <br />1.000 <br />(G EN.) <br />Visibility: <br />1.000 _ <br />(AVG.) <br />Job efficiency: <br />0.830 (1 <br />SHIFT /DAY) <br />Spoil pile: <br />0.800 <br />(FND -RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 �— <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: 59.75 LCY /hr <br />Adjusted fleet production: 59.75 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $2.106 /LCY <br />Total job time: 33.27 Hours_ <br />Total job cost: $4,185.77 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.