My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_REVISION - X200521710 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X200521710
>
2013-07-01_REVISION - X200521710 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:07 PM
Creation date
7/3/2013 9:30:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200521710
IBM Index Class Name
REVISION
Doc Date
7/1/2013
Doc Name
Proposed Decision Letter & Cost Estimate
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
SL1
Email Name
ERR
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade_SS -9 Access Road <br />Bowie Spruce Stomp Coal Permit Action: <br />Site: Expl Protect SL1 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 6/7/2013 - County: Delta _ <br />User: ERR <br />Agency or organization name: DRMS <br />Page 1 of 2 <br />Permit /Job #: X200521710 <br />Abbreviation: None <br />Filename: X217 -001 <br />HOURLY EQUIPMENT COST <br />Initial Volume: <br />1,767 <br />Basic Machine: Cat D6T <br />1.125 <br />Loose volume: <br />Horsepower: 185 <br />Source of estimated <br />volume: Division of Reclamation, Mining & Safety <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />_ <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost /Hour: <br />$30.43 <br />NA <br />Operating Cost /Hour: <br />$57.97 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $125.81 <br />Total Fleet Cost/Hour: $125.81 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />1,767 <br />Swell factor: <br />1.125 <br />Loose volume: <br />_ <br />1,988 LCY <br />Source of estimated <br />volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjusted hourly production: 153.6 LCY /br <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 7,700 feet <br />Material weight: 2,650 ibs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: - 0_900 1 _ (CAT HB)) — <br />CIRCES Cost Estimator.- Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.