My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-01_REVISION - X200521710 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X200521710
>
2013-07-01_REVISION - X200521710 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:22:07 PM
Creation date
7/3/2013 9:30:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200521710
IBM Index Class Name
REVISION
Doc Date
7/1/2013
Doc Name
Proposed Decision Letter & Cost Estimate
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
SL1
Email Name
ERR
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary of Tasks Remaining for NO[ X- 2005- 217 -10 <br />Site: Bowie Spruce Stomp Coal Expl Project Permit Action: SLl <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 6/7/2013 County: Delta _ <br />User: ERR <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit /Job #: X200521710 <br />Abbreviation: None <br />Filename: X217 -000 <br />Task <br />Description _ <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />I Hours <br />Cost <br />001 <br />002 <br />003 <br />_ <br />Re grade SS -9 Access Road <br />_ _ <br />DOZER 1 <br />DOZER 1 <br />REVEGE 1 <br />33.27 <br />5.36 <br />1.25 <br />$4,185.77 <br />$674.65 <br />$3,267.69 <br />Re lace Topsoil on SS -9 Access Road <br />Reseed SS -2 & SS -5 Drill Pads and SS -9 Access <br />Road <br />SUBTOTALS: <br />39.88 <br />$8,128.11 <br />INDIRECT COSTS <br />$164.19 <br />OVERHEAD AND PROFIT: <br />$85.35 <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total = <br />$164.19 <br />Total = <br />$85.35 <br />Total = <br />$0.00 <br />Total = <br />$812.81 <br />TOTAL O & P = <br />$1,062.35 <br />CONTRACT AMOUNT (direct + O & P) _ <br />$9,190.46 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 0.00 Total = 0.00 <br />Engineering work and /or contract/bid preparation: 4.25% Total = $390.59 <br />Reclamation management and /or administration: 5.00% $459.52 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $1,912.47 <br />TOTAL BOND AMOUNT (direct + indirect) = $10,040.58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.