Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Repj ce Topsojl on SS -9 Access Road <br />Bowie Spruce Stomp Coal Permit Action: <br />Site: Expl Project SL1 Permit /Job #: X200521710 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 6/7/2013 County: Delta <br />User: ERR <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D6T <br />Horsepower: 185 <br />Blade Type: Semi-Universal_ <br />Attachment: NA <br />Shift Basis: __ l_er dad <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost /Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: _ <br />Operator Cost /Hour: <br />Total unit Cost/Hour: $125.81 <br />Total Fleet Cost/Hour: $125.81 <br />$_30.43 <br />$57.97 <br />$0.00__ <br />$37.41 <br />Utilization % <br />NA <br />- - -�-- - -- 100 <br />—T 0 <br />-- — I - - NA <br />Abbreviation: None <br />Filename: X217 -002 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />1,178 <br />Swell factor: <br />1_.000 <br />Loose volume: <br />1,178 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safe <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />Ann L r <br />Materials consistency description: Partly consolidated <br />Average push gradient: 0% <br />Average site altitude: 7,700 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />ile 1.1 <br />CIRCES Cost Estimating Sofrivare <br />