My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-28_PERMIT FILE - C1994082A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1994082A
>
2006-02-28_PERMIT FILE - C1994082A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:19 PM
Creation date
6/27/2013 9:31:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity <br />• Scraper Payload (weight) Basis : I Scraper Bowl (volume) Basis <br />Material weight : 2,100 pounds/LCY <br />Material description <br />Forth -Loam <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY'*' <br />Rated payload : 75,000 pounds <br />Payload capacity : 35.71 LCY <br />• <br />lion reflects volume per scraper pair on push-pull models <br />Cvcle Time : ob Condition Corrections : Site altitude (ft.) : 7,800 <br /> Scraper Push dozer Source <br />Scraper loading time * : 1.00 minutes Altitude adj.: 0.980 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830. NA (Cat HB) <br />• loatl time per scraper pair on push-pull models Net correction : 0.813 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2" lire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 690 -14.50 5.00 -9.50 1628 0.55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.55 minutes <br />Return route <br />fable veloaties are maz. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver antl spread + return) <br />Unadjusted unit produdion/hour : 1,020.21 LCY/hour **' Adjusted forjob conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br /> <br />minutes <br />3.06 minutes <br />829.84 LCY/hour <br />2 scraper(s) <br />829.84 LCY/hour <br />1,659.68 LCVmour <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job time : 39.76 Hours <br />Unit cost : $0.741 /LCY Total job cost <br />'• travel tlme for each segment is adjustetl for acceleration/deceleration. Retum time : 0.97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.