Laserfiche WebLink
sheet 1 of 2 <br />• <br />PROJECT IDENTIFICATION <br />Permit or other job action :Permit Renewal 02 <br />Task description :Replace Topsoil from Stockpile H to Pit <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 045 State : Colomdo PenniUjob # : C-1994082 <br />Date : 12/06/2005 County : Routt Abbreviation :none <br />User : JRS Site : Yoast Mine Filename : C082-045 <br />r ;: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Scraper work team -Scraper <br />-Push dozer <br />• Cost Bre <br />CIRCES Cost Estimatins;l Software <br />Support equipment -Load area :NA <br />-Dump area : NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour ; $76.44 NA NA NA $34.94 $22.35 <br />Operatingcost/hour: $166.38 NA NA NA $10.59 $9.17 <br />Ripper op. cosUhour : NA NA NA NA $0.00 NA <br />OperatorcosUhour: $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $77.50 $52.68 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support : $0.00 Maintenance : $130.18 <br />Total work team cosUhour : $1,230.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 108,148 LCY factor : NA volume : 108,148 LCY <br />Description <br />• Source of quantity take-off : Yoast 2001 Annual Reclamation Report -Table 01.1; Map 12-1A <br />Source of estimated swell factor : NA <br />