Laserfiche WebLink
sheet 1 of 2 <br />ClRCES Cost Estimating Software <br />u <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 044 State :Colorado PermiUjob # : C-1994082 <br />Date : 12/06/2005 County : Routt Abbreviation :none <br />User : JRS Site : Yoast Mine Filename :C082-044 <br />Permit or other job action :Permit Renewa102 <br />Task description :Replace Topsoil from Stockpile G to Pit <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper ;Cat 637G w/push-pull <br />-Push dozer;NA <br />Cost Bre <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck ;Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA gratler misctmk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $76.44 NA NA NA $34.94 $22.35 <br />Operating cosUhour : $166.38 NA NA NA $10.59 $9.17 <br />Ripper op.cost/hour: NA NA NA NA $0.00 NA <br />Operator cosUhour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $77.50 $52.68 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support : $0.00 Maintenance : $130.18 <br />Total work team cosvhour : $1,230.06 <br />MATERIAL QUANTITIES <br />Initial ~ Swell Loose <br />volume : 65,982 LCY factor : NA volume : 65,982 LCY <br />• Source of quantity take-off : Yoast 2001 Annual Reclamation Repoli -Table 01.1; Map 12-1A <br />Source of estimated swell factor : NA <br />