Laserfiche WebLink
and it might be necessary to add additional shifts in the future depending on the economy and <br />production required. It is anticipated that up to 20 employees will be on site as operations <br />advance. There are no man -made structures within 200 feet of the permit boundary of either the <br />Sangre de Christo Tunnel or the Air Raise Areas. Care will be taken to meet State and County <br />noise standards. <br />