My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_PERMIT FILE - C1996083A (18)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-04-05_PERMIT FILE - C1996083A (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:11 PM
Creation date
5/21/2013 12:31:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/5/2013
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 5 of 312 <br />SUBTOTALS: 13170.9 $8,742,874.59 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$176,606.07 <br />Performance bond: <br />1.05% <br />Total = <br />$91,800.18 <br />Job superintendent: <br />2,100.00 hrs <br />Total = <br />$137,361.00 <br />Profit: <br />10.00% <br />Total = <br />$874,287.46 <br />TOTAL O & P = <br />$1,280,054.71 <br />CONTRACT AMOUNT (direct + O & P) = <br />$10,022,929.30 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and/or contractibid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />4.00% <br />3.13% <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $400,917.17 <br />$31 3,717.69 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,994,689.57 <br />TOTAL BOND AMOUNT (direct + indirect) = $10,737,564.16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.