My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_PERMIT FILE - C1996083A (18)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-04-05_PERMIT FILE - C1996083A (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:11 PM
Creation date
5/21/2013 12:31:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/5/2013
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Pull back and Haul Portal Bench Fill Material to Cut <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 1/16/2013 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Cat 773F <br />- Loader: Cat 365C L 13' -7" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Page 6 of 312 <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -001 <br />Shift basis: l per day <br />Cost Breakdawnr Tmrk /I.nndPr TPnm Gar. —f. R;_+ _+ TEA- .- ,...,. --- c,.-.:_...,._. <br />Total work team cost/hour: $663.84 <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$60.64 <br />$78.81 <br />NA <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$119.47 <br />$139.55 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$25.66 <br />$33.94 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$205.77 <br />$252.30 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $663.84 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $663.84 <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity' <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 <br />Pounds /LCY <br />Description: Decomposed rock - <br />50% Rock, 50% Earth <br />Rated Payload: 122,520 <br />Pounds <br />Payload Capacity: 42.25 <br />LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.