Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 4 of 312
<br />170
<br />171
<br />172
<br />173
<br />174
<br />180
<br />181
<br />182
<br />183
<br />241
<br />242
<br />252
<br />253
<br />254
<br />255
<br />256
<br />257
<br />261
<br />278
<br />279
<br />280
<br />281
<br />282
<br />283
<br />284
<br />285
<br />286
<br />287
<br />288
<br />289
<br />290
<br />299
<br />300
<br />301
<br />302
<br />331
<br />335
<br />337
<br />338
<br />339
<br />340
<br />341
<br />Proctor Testing of Backfill
<br />NA
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />10.00
<br />$689.85
<br />$125,910.40
<br />$127,191.00
<br />$238,012.40
<br />$103,205.76
<br />$46,787.39
<br />$46,787.39
<br />$4,574.19
<br />$29,916.42
<br />$7,415.42
<br />$5,599.40
<br />$1,374.20
<br />$5,848.35
<br />$401.90
<br />$2,650.90
<br />$1,285.74
<br />$4,838.09
<br />$151,385.41
<br />$8,583.58
<br />$86,308.99
<br />$32,425.71
<br />$24,617.51
<br />$24,418.65
<br />$18,538.40
<br />$11,305.14
<br />$1,621.35
<br />$908.09
<br />$648.50
<br />$265.93
<br />$1,280.08
<br />$403.50
<br />$6,849.62
<br />$14,649.86
<br />$542.64
<br />$1,011.57
<br />$2,628.36
<br />$1,487.17
<br />$1,391.40
<br />$5,544.98
<br />$1,767.07
<br />$3,338.67
<br />$1,417.10
<br />Nuclear Density Testing of Backfill
<br />NA
<br />1,760.00
<br />Water Truck for Moisture Augmentation of
<br />Backfill Material
<br />MISCTRUK
<br />1,437.02
<br />Site Maintenance - Ten Years
<br />SITEMAINT
<br />ENANCE
<br />292.00
<br />Support Equipment for Scraper Hauling
<br />SITEMAINT
<br />ENANCE
<br />449.16
<br />Mobilize /Demobilize Equipment for First
<br />Construction Season
<br />MOBILIZE
<br />12.00
<br />Mobilize /Demobilize Equipment for Second
<br />Construction Season
<br />MOBILIZE
<br />12.00
<br />Mobilize /Demoblize Equipment for Pond Removal
<br />MOBILIZE
<br />6.50
<br />Mobilize /Demobilize Equipment for Yearly Site
<br />Maintenance
<br />MOBILIZE
<br />14.00
<br />Regrade Terror Creek Light-Use Road
<br />DOZER
<br />29.73
<br />Replace Topsoil from Stockpile to Terror Creek
<br />Lt -Use Road
<br />DOZER
<br />22.45
<br />Regrade BRL- 1- 03 -01, 1- 08 -01, and 1 -08 -04 pads
<br />DOZER
<br />5.51
<br />Regrade Light -Use Roads BRL- 1- 03 -01, - 08 -01,
<br />and -08 -04
<br />DOZER
<br />23.45
<br />Replace topsoil on BRL- 1- 03 -01, - 08 -01, and -08-
<br />04 pads
<br />DOZER
<br />1.61
<br />Replace topsoil on LU Roads to BRL- l- 03 -01, -
<br />08 -01, & -08 -04
<br />DOZER
<br />10.63
<br />Reseed BRL- 1- 03 -01, - 08 -01, and -08 -04 pads
<br />REVEGE
<br />4.00
<br />Reseed BRL- 1- 03 -01, - 08 -01, and -08 -04 LU roads
<br />REVEGE
<br />16.00
<br />Concrete plug and backfill Terror Creek vent shaft
<br />NA
<br />40.00
<br />Access Road Topsoil (9.08 acres - TR73)
<br />DOZER
<br />43.32
<br />Plug and seal 13 boreholes TR -73
<br />BOREHOLE
<br />156.00
<br />Reseed Drill Pads (13 pads - TR -73)
<br />REVEGE
<br />23.92
<br />Reseed Access Roads - TR -73
<br />REVEGE
<br />18.16
<br />Drill Pad backfill (13 pads TR -73)
<br />DOZER
<br />123.24
<br />Access Road Regrading (9.08 acres - TR73)
<br />DOZER
<br />93.57
<br />Drill Pad Topsoil (13 pads - TR73)
<br />DOZER
<br />57.06
<br />Regrade GVB -B13F Drill Pad
<br />DOZER
<br />6.50
<br />Regrade Light-Use Road to GVB -B 13F
<br />DOZER
<br />3.64
<br />Replace Topsoil from Stockpile to GVB -B13F pad
<br />DOZER
<br />2.60
<br />Replace Topsoil from Stockpile to GVB -B13F
<br />Light-Use Road
<br />DOZER
<br />1.07
<br />Reseed GVB -B13F Drill Pad
<br />REVEGE
<br />2.00
<br />Reseed Light-Use Road to GVB -B 13F
<br />REVEGE
<br />2.00
<br />Plug and Seal GVB -B13F
<br />BOREHOLE
<br />48.00
<br />Plug and Seal 4 Utility Holes at Fan Bench
<br />BOREHOLE
<br />48.00
<br />Reseed Add'1 Disturbance from Utility Boreholes
<br />at Fan Bench
<br />REVEGE
<br />1.00
<br />Regrade Fan Bench - Utility Borehole Mudpit
<br />Add'1 Dist.
<br />DOZER
<br />4.06
<br />Regrade Vent Hole B13 Drill Pad
<br />DOZER
<br />10.54
<br />Re-topsoil Vent Hole B13 Drill Pad
<br />DOZER
<br />5.96
<br />Reseed Bleeder Vent Boreholes B13
<br />REVEGE
<br />0.20
<br />Plug and Seal GVB B13C -I
<br />BOREHOLE
<br />48.00
<br />Reseed road and pad for GVB B13C -1
<br />REVEGE
<br />2.00
<br />Regrade GVB B13C -1 pad and road
<br />DOZER
<br />13.39
<br />Re-topsoil GVB B13C -1
<br />DOZER
<br />5.68
<br />
|