My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_PERMIT FILE - C1996083A (18)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-04-05_PERMIT FILE - C1996083A (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:11 PM
Creation date
5/21/2013 12:31:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/5/2013
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 3 of 312 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />110 <br />1 I 1 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br />127 <br />128 <br />129 <br />130 <br />131 <br />140 <br />141 <br />142 <br />150 <br />151 <br />152 <br />154 <br />155 <br />156 <br />157 <br />165 <br />Backfill and Re grade Pond C <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />11.61 <br />$3,849.63 <br />$2,712.93 <br />$3,603.42 <br />$6,726.38 <br />$505.20 <br />$318.00 <br />$35,040.73 <br />$363,291.49 <br />$23,675.47 <br />$22,263.01 <br />$48,814.27 <br />$1,273.32 <br />$7,303.88 <br />$1,350.55 <br />$1,588.31 <br />$1,067.77 <br />$37,359.60 <br />$48,046.47 <br />$12,479.57 <br />$250.33 <br />$16,047.92 <br />$38,528.45 <br />$73,884.88 <br />$228.58 <br />$952.98 <br />$2,791.77 <br />$7,434.02 <br />$148.25 <br />$1,009.85 <br />$181,171.28 <br />$98,746.83 <br />$766,245.38 <br />$591,236.10 <br />$52,274.71 <br />$60,052.61 <br />$131,843.93 <br />$1,669.67 <br />$278.28 <br />$51,528.62 <br />$1,725,362.77 <br />Backfill and Re grade Gob Pile Pond D <br />DOZER <br />8.18 <br />Backfill and Re grade Pond F <br />DOZER <br />10.87 <br />Backfill and Re grade Pond J <br />DOZER <br />20.29 <br />Backfill and Re grade Pond K <br />DOZER <br />1.52 <br />Excavate for Post - mining Channel at B -Seam <br />Portals <br />EXCAVATE <br />0.63 <br />Install Riprap, Gavel, and geotextile in BSeam <br />Channel <br />NA <br />72.59 <br />Replace Topsoil from Stockpile A to Portal/Utility <br />Bench <br />SCRAPERI <br />652.39 <br />Replace Topsoil from Stockpile A to Truck <br />Loadout /Coal Stk 1 <br />SCRAPERI <br />42.52 <br />Replace Topsoil from Stockpile F to Train Loadout <br />SCRAPERI <br />39.98 <br />Replace Topsoil from Stockpile A to B -Seam <br />Portal Bench <br />SCRAPERI <br />87.66 <br />Replace Topsoil fin Stockpile to Freeman Gulch <br />Vent Shaft Pad <br />DOZER <br />0.93 <br />Replace Topsoil fm Stockpiles C/D to Pond C and <br />Gob Pond D <br />SCRAPERI <br />13.12 <br />Replace topsoil from Stockpile to Pond F <br />DOZER <br />3.95 <br />Replace topsoil from Stockpile F to Pond J <br />SCRAPERI <br />2.85 <br />Replace topsoil from Stockpile F to Pond K <br />SCRAPERI <br />1.92 <br />Replace topsoil fm stockpile to MR/TR Light -Use <br />Roads <br />DOZER <br />27.35 <br />Replace topsoil from stockpiles to MR/TR drill <br />ads <br />DOZER <br />36.23 <br />Replace topsoil from Stockpile A to Prep Plant <br />Bench <br />SCRAPERI <br />22.41 <br />Replace topsoil from stockpile to Material Storage <br />Area <br />DOZER <br />0.18 <br />Replace topsoil from Stockpile E to Gob Pile #2 <br />SCRAPERI <br />28.82 <br />Replace Topsoil from Stockpile to Gob Pile 42 <br />SCRAPERI <br />69.19 <br />Replace topsoil from stockpile to Gob Pile #3 <br />SCRAPERI <br />132.68 <br />Replace topsoil from stockpile to Haul Road <br />DOZER <br />0.17 <br />Replace topsoil from stockpile to Water Tank <br />Bench <br />SCRAPERI <br />1.71 <br />Replace topsoil from Stockpile G to TR35 <br />road/ ad <br />SCRAPERI <br />5.01 <br />Replace topsoil from stockpile to Borrow Area <br />DOZER <br />5.44 <br />Replace topsoil fm stockpile to Upper Parking Lot <br />Expansion <br />DOZER <br />0.46 <br />Replace topsoil fm stockpile to Hubbard Ck Vent <br />Shaft Pad <br />DOZER <br />0.74 <br />Seal Portals and Shafts <br />MINESEAL <br />40.00 <br />Concrete Plug and Backfill Vent Shaft <br />NA <br />40.00 <br />Plug/Seal Boreholes <br />BOREHOLE <br />1,502.00 <br />Drill Seed Mix 3 on Disturbed Area <br />REVEGE <br />40.00 <br />Drill Seed Drill Pads <br />REVEGE <br />60.00 <br />Drill Seed Lt -Use Roads to Drill Pads and Terror <br />Creek <br />REVEGE <br />65.00 <br />Broadcast Seed Mix 3 on Gob Pile #3 <br />REVEGE <br />0.00 <br />Drill seed Hubbard Creek Vent Shaft Pad <br />REVEGE <br />0.00 <br />Drill Seed Rock La down Area <br />REVEGE <br />0.00 <br />Weed Control Over 10 -Year Liability Period <br />REVEGE <br />0.00 <br />FTemolish and Remove all Structures <br />DEMOLISH <br />80.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.