Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 2 of 312 <br />027 <br />035 <br />036 <br />037 <br />038 <br />039 <br />040 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />050 <br />051 <br />052 <br />053 <br />054 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />095 <br />Haul Rock to Vent Shafts for Disposal <br />TRUCKI <br />1 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />1 <br />4 <br />1 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />10.50 <br />$4,249.97 <br />$87,196.19 <br />$111,037.35 <br />$ 126,899.83 <br />$1,877.00 <br />$21,525.00 <br />$18,834.00 <br />$20,807.00 <br />$8,124.49 <br />$48,317.67 <br />$57,257.50 <br />$238,906.47 <br />$56,244.80 <br />$80,975.00 <br />$8,883.00 <br />$30,278.00 <br />$18,049.00 <br />$257.00 <br />$423.00 <br />$5,074.00 <br />$2,819.00 <br />$80,726.00 <br />$10,509.00 <br />$5,074.00 <br />$147.00 <br />$159,846.00 <br />$17,006.95 <br />$2,946.00 <br />$7,097.98 <br />$4,050.00 <br />$93,914.32 <br />$33,412.46 <br />$3,238.00 <br />$7,056.51 <br />$1,011.00 <br />$2,705.66 <br />$2,295.72 <br />$287.00 <br />$598.38 <br />$1,304.00 <br />$49,800.93 <br />$114,197.16 <br />$17,754.00 <br />$2,311.00 <br />$945.00 <br />$2,238.00 <br />$2,604.29 <br />Spread Uncom acted Refuse on Gob Pile #2 <br />DOZER <br />68.14 <br />Spread Uncom acted Refuse on Gob Pile #2 <br />DOZER <br />86.77 <br />Spread Uncom acted Refuse at Gob Pile #3 <br />DOZER <br />99.16 <br />Compact Material Hauled to Gob Pile #1 <br />COMPACT <br />13.38 <br />Compact Refuse on Gob Pile #2 <br />COMPACT <br />153.51 <br />Compact Refuse on Gob Pile #3 <br />COMPACT <br />134.32 <br />Compact Refuse at Gob Pile #3 <br />COMPACT <br />148.39 <br />Haul Top F from Stockpile Area to Gob Pile #1 <br />SCRAPERI <br />14.59 <br />Place 4' of Cover on Gob Pile #1 <br />SCRAPERI <br />86.77 <br />Replace Subsoil from Stockpile to Gob Pile #2 <br />SCRAPERI <br />102.82 <br />Replace Subsoil from Stockpile to Gob Pile #2 <br />SCRAPERI <br />429.02 <br />Place 1.6' of Cover on Gob Pile #3 <br />SCRAPERI <br />101.00 <br />Compact Backfilled D -Portal Bench,Roads, & <br />Utility Corridor <br />COMPACT <br />577.52 <br />Compact Backfilled Material at Truck <br />Loadout/Coal Stockpile <br />COMPACT <br />63.35 <br />Compact Backfilled Train Loadout <br />COMPACT <br />215.94 <br />Compact B -Seam Portal Bench <br />COMPACT <br />128.72 <br />Compact Backfilled Freeman Gulch Vent Shaft <br />Pad <br />COMPACT <br />1.83 <br />Rip Utility Bench <br />RIPPER <br />0.30 <br />Rip D -Portal Bench <br />RIPPER <br />3.71 <br />Rip Truck Loadout/Coal Stockpile Area <br />RIPPER <br />2.06 <br />Rip Regraded Mine Area Prior to Topsoil <br />Replacement <br />RIPPER <br />59.09 <br />Rip Train Loadout Facilities and Railbed Benches <br />RIPPER <br />7.69 <br />Rip B -Seam Portal Bench <br />RIPPER <br />3.71 <br />Rip Rock La down Pad Topsoil <br />RIPPER <br />0.43 <br />Rip Haul Roads (Portion Being Reclaimed) & Old <br />Truck Loadout <br />RIPPER <br />116.47 <br />Remove Haul Road Subbase and Place on Gob Pile <br />#1 <br />SCRAPERI <br />30.54 <br />Rip Truck Loadout Road <br />RIPPER <br />2.14 <br />Haul Truck Loadout Subbase to Gob Pile #1 <br />SCRAPERI <br />12.75 <br />Rip Upper Haul Road Asphalt Prior to Road <br />Narrowing <br />RIPPER <br />2.95 <br />Pull Back/Haul Fill Mat'l from Upper Haul Rd <br />Narrowing <br />TRUCKI <br />141.47 <br />Re grade Narrowed Section of Haul Road <br />DOZER <br />26.11 <br />Rip Gob Pile #1 Road <br />RIPPER <br />2.35 <br />Re grade Gob Pile #1 Road <br />DOZER <br />5.17 <br />Rip Access Road <br />RIPPER <br />0.73 <br />Haul Access Road Surface to Gob Pile #1 <br />SCRAPERI <br />4.86 <br />Re grade Access Road <br />DOZER <br />1.79 <br />Rip Freeman Gulch Vent Shaft Light-Use Road <br />RIPPER <br />0.20 <br />Backfill and Re grade Haul Road to Gob Pile #2 <br />DOZER <br />0.44 <br />Rip Lower Haul Road <br />RIPPER <br />0.95 <br />Re grade Lower Haul Road <br />DOZER <br />36.46 <br />Re grade Light Use Roads from MRs and TRs <br />DOZER <br />83.60 <br />Finish Grade Disturbed Mine Area <br />GRADER <br />129.92 <br />Finish Grade Train Loadout <br />GRADER <br />16.91 <br />Finish Grade B -Seam Portal Bench <br />GRADER <br />6.91 <br />Finish Grade Gob Pile #2 <br />GRADER <br />16.37 <br />Backfill and Regrade Pond B <br />DOZER <br />7.63 <br />