Laserfiche WebLink
Task description: <br />Site: Lindsey Pit <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 4/5/2013 <br />User: BMK <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $138.47 <br />Total Fleet Cost/Hour: $276.94 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Cat D6T LGP <br />200 <br />Straight <br />NA <br />1 per day <br />(CRG) <br />8,500 <br />1.429 <br />12,143 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Apply 9 inches of top soil over 7 acres <br />Materials consistency description: Loose stockpile 1.2 <br />-5 % <br />4,029 feet <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />$35.09 <br />$65.97 <br />$0.00 <br />$37.41 <br />230 feet <br />132.5 LCY/hr <br />1,600 lbs/LCY <br />BULLDOZER WORK <br />Permit Action: New Permit <br />State: Colorado <br />County: Philips <br />0.750 <br />1.200 <br />1.200 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Division of Reclamation, Mining & Safety <br />Source <br />(AVG.) <br />(CAT HB) <br />(SLOT) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: M2013015 <br />Filename: MO15 -002 <br />C[RCES Cost Estimating Software <br />