Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />JOB TIME AND COST <br />Net correction: 1.2935 <br />Adjusted unit production: 171.39 LCY/hr <br />Adjusted fleet production: 342.78 LCY /hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.808/LCY <br />Total job time: 35.43 Hours <br />Total job cost: $9,810.72 <br />1.000 <br />0.830 <br />0.900 <br />1.115 <br />1.000 <br />1.438 <br />1.000 <br />(AVG.) <br />(1 SHIFT/DAY) <br />(S SD -FC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />Page 2 of 2 <br />