Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 001 <br />Visibility: 1.000 <br />Job efficiency: 0.830 <br />Spoil pile: 0.900 <br />Push gradient: _ 1.115 <br />Altitude: 1.000 <br />Material Weight: 0.902 <br />Blade type: 1.000 <br />Net correction: 0.6818 <br />Adjusted unit production: _ 251.18 LCY /hr <br />Adjusted fleet production: 502.36 LCY /hr <br />JOB TIME AND COST <br />Fleet size: _ 2 Dozer(s) <br />Unit cost: $0.621/LCY <br />Total job time: 10.72 Hours <br />Total job cost: $3,345.34 <br />(AVG.) <br />(1 SHIFT/DAY) <br />(SSD-FC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />