My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_PERMIT FILE - X201322801
DRMS
>
Day Forward
>
Permit File
>
Coal
>
X201322801
>
2013-04-15_PERMIT FILE - X201322801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2020 5:04:58 PM
Creation date
4/15/2013 2:57:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201322801
IBM Index Class Name
Permit File
Doc Date
4/15/2013
Doc Name
Cost Estimate
From
DRMS
To
Ark Land Company
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Workshect Contd Task # 002 Page 2 oft <br />Dozing method <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Attitude: <br />Material Weight: <br />Blade type: <br />I.000 <br />1.000 <br />0.8130 <br />(1 SHIFT DAY) <br />0.800 <br />(FND-RF) <br />I MO <br />1.000 <br />(CAT HB) <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />172.95 LCY/hr <br />172.95 LCYdir <br />Fleet size: I Dozer(s) <br />Unit cost: $0.-727,/LCY <br />Total job time: <br />Total job cost: <br />88.44 Hours <br />$11,126.73 <br />CIRCES Cost FidmatmL, Sollware <br />
The URL can be used to link to this page
Your browser does not support the video tag.