Laserfiche WebLink
Bulldozer Workshect Contd Task # 002 Page 2 oft <br />Dozing method <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Attitude: <br />Material Weight: <br />Blade type: <br />I.000 <br />1.000 <br />0.8130 <br />(1 SHIFT DAY) <br />0.800 <br />(FND-RF) <br />I MO <br />1.000 <br />(CAT HB) <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />172.95 LCY/hr <br />172.95 LCYdir <br />Fleet size: I Dozer(s) <br />Unit cost: $0.-727,/LCY <br />Total job time: <br />Total job cost: <br />88.44 Hours <br />$11,126.73 <br />CIRCES Cost FidmatmL, Sollware <br />