My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_PERMIT FILE - X201322801
DRMS
>
Day Forward
>
Permit File
>
Coal
>
X201322801
>
2013-04-15_PERMIT FILE - X201322801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2020 5:04:58 PM
Creation date
4/15/2013 2:57:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201322801
IBM Index Class Name
Permit File
Doc Date
4/15/2013
Doc Name
Cost Estimate
From
DRMS
To
Ark Land Company
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br />BULLDOZER WORK <br />Task description: Reg ade Drill Pads and Mud Pits <br />2013-2014 Sunset Trail Permit Action: <br />Site: Exploration Drilling X201322801 Pen-nit/Job4: X201322801 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 4/12/2013 <br />User, R <br />State: Colorado <br />County. Gunnison <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown- <br />Cat D6T <br />Sergi- Universal <br />NA <br />(CRG) <br />Utilization % <br />Ownership Cost/Hour: NA <br />Operatin- Cost/Hour: $57.97 too <br />I <br />Ripper op. Cost/Hour: 50.00 <br />Operator Cost/Hour: S37.41 NA <br />Total unit Cost/Hour: S125.81 <br />Total Fleet Cost/Hour: $125.81 <br />NIATERIAL-QUANTITIES <br />Initial Volume: 13,596 <br />Swell factor. 1.125 <br />Loose volume: 15,296 I,CY <br />Source of estimated volume: Division of Reclamation, Mining,,& <br />Source of estimated swell factor.- Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: Compacted fil I or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description., <br />0% <br />9,800 feet <br />2,650 lbs/1-CY <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: O 750 (AVG.) <br />Material consistency: 0 900 (CAT HB)) <br />Abbreviation: <br />Filename: <br />IBM <br />X228-002 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.