Laserfiche WebLink
Site: <br />Pagel of`2 <br />BULLDOZER WOPK <br />Task description: Regrade Roads <br />2013-2014 Sunset Trail Permit Action: <br />Exploration Drilling X2013/2,28001 Permit/Job#.- X201322801 <br />PROJECT IDENTIFICATION <br />Task 4; 003 <br />Date: 4/1212013 <br />User: ERR <br />State. Colorado <br />County: Gunnison <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine. <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown <br />Cat D6T <br />185 <br />Semi - Universal <br />3- shank rtper ..... . .. . .......... . ....... <br />—I per day <br />(CRG) <br />Abbreviation: None <br />Filename: X228-003 <br />MATERIAL QUANTITIES <br />Initial Volume- 22,657 <br />Swell factor: 1.125 <br />Loose volurne: 25,489 LCY <br />Source of estimated volurne: Division olReclarnation, Mining R. <br />Source of estimated swel I factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjusted hourly production: 153.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient- 0% <br />Average site altitude: 9A0 feet <br />Material weight: 2,650 lbs/LCY <br />Weiglit description- _ Dcco!IT,used rock 25% buck, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0x750 (AVG) <br />Material consistency: 0.900 (CAT <br />UR(TS Cost F'sfinuitmg Software <br />Utilization % <br />Ownership Costi Hour: <br />$3112 <br />NA <br />Operating Cost/Hour: <br />$57.97 <br />too <br />Ripper op. Cost/Hour: <br />$1,01 <br />Operator Cost/Hour: <br />$37A1 <br />NA <br />Total unit Cost/Hour: <br />$124.52 <br />Total Fleet Cost/Hour: <br />$129.52 <br />MATERIAL QUANTITIES <br />Initial Volume- 22,657 <br />Swell factor: 1.125 <br />Loose volurne: 25,489 LCY <br />Source of estimated volurne: Division olReclarnation, Mining R. <br />Source of estimated swel I factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjusted hourly production: 153.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient- 0% <br />Average site altitude: 9A0 feet <br />Material weight: 2,650 lbs/LCY <br />Weiglit description- _ Dcco!IT,used rock 25% buck, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0x750 (AVG) <br />Material consistency: 0.900 (CAT <br />UR(TS Cost F'sfinuitmg Software <br />