Laserfiche WebLink
MR -117: Minor Revision No. 117 was submitted on February 21, 2012, and found complete on <br />March 2, 2012. MR -17 provided updated as -built drawings for four ponds constructed in the <br />East Pit reclamation area.. MR -117 was approved on March 12, 2012. <br />MR -118: Minor Revision No. 118 was submitted on May 5, 2012, and found complete on May <br />11, 2012. MR -188 updated three maps to accurately depict the location of the Prospect Ditch. <br />MR -118 was approved on June 7, 2012. <br />MR -119: Minor Revision No. 119 was submitted on August 16, 2012, and found complete on <br />August 24, 2012. MR -119 provided updates to the PAP regarding a wildland fire that burned a <br />portion of the permit area. MR -119 was approved on August 24, 2012. <br />MR -120: Minor Revision No. 120 was submitted on August 23, 2012, and found complete on <br />August 29, 2012. MR -120 updated Map 22 to include a salt storage building. MR -120 was <br />approved on September 13, 2012. <br />MR -121: Minor Revision No. 121 was submitted on September 5, 2012, and found complete on <br />September 6, 2012. MR -121 updated section 4.09 of the PAP regarding terrace ditches on West <br />Taylor Fill. MR -121 was approved on September 6, 2012. <br />MR -122: Minor Revision No. 122 was submitted on October 9, 2012, and found complete on <br />October 16, 2012. MR -122 updated Map 22 to show the relocation of two diesel tanks. MR -122 <br />was approved on October 16, 2012. <br />MR -123: Minor Revision No. 123 was submitted on November 21, 2012, and found complete <br />on November 21, 2012. MR -123 updated Map 22 to show the relocation of one diesel tank. <br />MR -123 was approved on November 21, 2012. <br />MR -124: Minor Revision No. 124 was submitted on January 22, 2013, and found complete on <br />January 28, 2013. MR -124 approved updates to as -built drawings for five East Pit ponds. MR- <br />124 was approved on February 7, 2013. <br />3.1.8 Status of Violations <br />One Notice of Violation (NOV) was issued since Permit Renewal Number 5. <br />NOV 2010 -004 was issued on August 23, 2010 for failure to construct permanent post- mining <br />drainage channels in accordance with the approved reclamation plan. The final compliance steps <br />were completed on November 9, 2010. NOV2010 -004 was terminated on November 10, 2010. <br />3.1.9 Applicant /Violator System <br />Applicant /Violator System (AVS) checks were conducted on February 24, 2001, and November <br />Colowyo Coal Mine C1981 -019 PR -03 19 April 10, 2013 <br />