Laserfiche WebLink
Task 417= $209,262,181.93 <br />CCC Table 6, rounded to $2,117,000.00 <br />DRMS Used CCC's Table 6. <br />Items added to the demo sheet that were not apparent in CCC's estimate: <br />Concrete footers or slabs for water tanks <br />Footers (piers) for ANFO tanks and Coal Silo <br />Removal of Powerline extension to Collom facilities area as shown on map 22B. <br />Topsoil Replacement: <br />Tasks 401 to 416, 425, 426, 450 = $3,317,726.17 <br />CCC's Topsoil tasks shown in Table 5 rounded to $4,438,000.00 <br />DRMS used the same soil volumes, haul distances and slopes as CCC. <br />Road reduction and reclamation: <br />Tasks 418, 419, 420, 421 = $2,215,299.48 <br />CCC's Table 7, rounded to $3,754,000.00 <br />DRMS used the same volumes, haul distances and slopes as CCC.0 <br />