My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-04-10_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:24 PM
Creation date
4/10/2013 12:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/10/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cow'd Task # TTT Page 1 of 113 <br />Colowyo Mine PR3 Reclamation Cost Estimate. Updated 12/27/2012 <br />Task description: Summary of PR3 tasks <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Task #: 400 <br />Date: 12/27/2012 <br />2:18:12 PM <br />COST SUMMARY WORK <br />Permit Action: PR3 <br />State: Colorado <br />County: Moffat <br />User: JHB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit /Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -400 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />401 <br />402 <br />403 <br />404 <br />405 <br />406 <br />407 <br />408 <br />409 <br />410 <br />411 <br />412 <br />413 <br />414 <br />415 <br />416 <br />417 <br />418 <br />419 <br />420 <br />421 <br />422 <br />423 <br />Haul Topsoil from TS 24A to Area 2 (249.14 acres) <br />SCRAPERI <br />3 <br />2 <br />2 <br />2 <br />2 <br />3 <br />1 <br />2 <br />4 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />2 <br />4 <br />4 <br />3 <br />1 <br />1 <br />130.94 <br />$593,748.56 <br />$146,512.96 <br />$72,620.97 <br />$244,659.05 <br />$648,373.30 <br />$297,352.56 <br />$26,823.47 <br />$217,886.15 <br />$556,061.46 <br />$171,658.27 <br />$43,846.71 <br />$22,762.36 <br />$125,080.98 <br />$53,488.59 <br />$55,558.84 <br />$10,902.50 <br />$1,911,067.34 <br />$102,377.00 <br />$332,003.00 <br />$1,055,897.52 <br />$725,021.96 <br />$196,181.15 <br />$749,211.39 <br />Haul Topsoil from TS 25A to Areal <br />SCRAPERI <br />91.08 <br />Haul Topsoil from TS 24A to Area 3 <br />SCRAPERI <br />45.14 <br />Haul Topsoil from TS 25B to Area 4 <br />SCRAPERI <br />79.65 <br />Haul Topsoil from TS 35A to Area 6 <br />SCRAPERI <br />211.08 <br />Haul Topsoil from TS 36A to Area 7 <br />SCRAPERI <br />125.23 <br />Haul Topsoil from TS 35A to Area 5 <br />SCRAPERI <br />30.58 <br />Haul Topsoil from TS 25B to Area 3 <br />SCRAPERI <br />135.45 <br />Haul Topsoil from TS 25A to Haul Road <br />SCRAPERI <br />181.03 <br />Haul Topsoil from TS 25A to Area 5 <br />SCRAPERI <br />104.49 <br />Haul Topsoil from TS 25B to Area 5 <br />SCRAPERI <br />27.26 <br />Haul Topsoil from TS 25B to Area 5 <br />SCRAPERI <br />7.41 <br />Haul Topsoil from TS 36A to Area 5 <br />SCRAPERI <br />77.76 <br />Haul Topsoil from TS 24A to LCX west <br />SCRAPERI <br />33.25 <br />Haul Topsoil from TS 25A to LCX east <br />SCRAPERI <br />34.54 <br />Haul Topsoil from TS 25A to DS pond <br />SCRAPERI <br />11.96 <br />Demolish /dispose of facilities at Collom expansion <br />area <br />DEMOLISH <br />60.00 <br />Rip 290,000 ft. of haul road <br />RIPPER <br />107.35 <br />Scarify subgrade 290,000 ft. of haul road (Table 7) <br />RIPPER <br />175.22 <br />Haul road - Haul -back in balanced cut /fill areas <br />(Table 7) <br />SCRAPERI <br />343.76 <br />Scraper haul from spoil pile -road reclamation <br />SCRAPERI <br />159.89 <br />Seed & reseed 290.45 acres disturbance <br />Shrub /Grass mix <br />REVEGE <br />290.45 <br />Seed & reseed 1161.46 acres disturbance <br />REVEGE <br />1,161.46 <br />CIRCES Cost Estimating Soffivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.