Laserfiche WebLink
Matti frr/Mmr Amor , <br />Date: February 20, 2013 <br />Company: Cripple Creek and Victor Gold Mine <br />City & State: Cripple Creek, CO. <br />Attn: Zeke Porter <br />Regarding: Storage Buildings <br />PROPOSAL <br />UCERTIFIED <br />t o FABRICATOR <br />Q AND ERECTOR <br />P.O. BOX 13 <br />1432 STOCKYARD ROAD <br />PUEBLO, CO 81002 <br />(719) 545 -0296 <br />(719) 544 -9054 Fax <br />ICM Proposes to design and build two pre- engineered metal buildings based on the following scope of <br />work: <br />1 <br />I <br />SCOPE: <br />Lube Storage Building <br />• 26' W x 40'L x 14' Eave Height <br />• Gable Roof with a 3:12 pitch <br />• 26 gauge panel rib walls <br />• 26 gauge panel rib roof <br />• 26 gauge liner panel to 8' height <br />• 6" R19 Batt Insulation <br />• (1) Ea 14' W X 12'H Cookson Insulated Service door, 22ga int/ext slats, chain hoist <br />• (1) Ea 10' W X 12'H Cookson Insulated Service door, 22ga int/ext slats, chain hoist <br />• (2) Ea. 3070 walk doors <br />• Foundation — Spread footers beneath columns, 8 "W x 42" grade beam with pilasters at columns(30" below <br />grade with 6" above finished floor for containment), 6" slab on grade, 4'x4' x 4" stoops at walk doors, 12'W <br />x 20'L x 6" concrete apron at overhead doors. <br />• Electrical — <br />• 200 amp 3 phase, 120/208 volt service, nema 1, with meter socket, service from Black Hills <br />adjacent to building, grounding per code, breakers and circuits to supply the following. <br />• 2 -7.5 KW electric unit heaters with stats <br />• 12- 6 -lamp P5 fixtures, 3 switches <br />• 2- outside wall -paks with photo -cell <br />• 6- receptacles, 1 mounted on outside wall, 2 per 20 amp circuit <br />• The raceway system is EMT conduit with pressed metal boxes <br />Parts Storage Building <br />• 40' W x 40'L x 14' Eave Height <br />• Gable Roof with a 3:12 pitch <br />• 26 gauge panel rib walls <br />• 26 gauge panel rib roof <br />• 26 gauge liner panel to 8' height <br />• 6" R19 Batt Insulation <br />Page 1 of 3 <br />2013_026 CCV Pre - Engineered Metal Storage Buildings <br />