My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-04_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2013-04-04_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:09 PM
Creation date
4/9/2013 11:40:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/4/2013
Doc Name
TR Submittal
From
CC&V
To
DRMS
Type & Sequence
TR67
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ellis Environmental Engineering, Inc. <br />4342 Ulysses Way <br />Golden, Colorado 80403 <br />March 18. 2013 <br />Mr. Timm Corner <br />Cripple Creek & Victor Gold Mining Company <br />P.O. I3ox 191 <br />100 North 3 Street <br />Victor. Colorado 80860 <br />Re: Warranty Calculations for Process Lube Storage and Parts Storage Buildings <br />Dear Timm, <br />1 have reviewed the proposed Process Lube Storage and Parts Storage Buildings Drawings and <br />Proposal from Industrial Constructors / Managers, Inc. dated February 20. 2013 for impacts to the <br />DRMS financial warranty calculations. Demolition costs liar the new structures are included in the <br />enclosed table. The financial warranty amount increases by $14,947 as a result. A breakdown of this <br />warranty calculation indicates $11197 in direct costs and $2,750 figured at 22.55% of total direct costs <br />for DRMS's administrative fees. <br />Structure Lenuth Width Height Volume Demo $ / cu ft Total Cost Source <br />Process Lube Bldg 40 ft 26 it 14 ft 14.560 cf $0.33 $4.805 1CM I.tr. to <br />(Pre -Fab Steel Structure) Z. Porter of <br />CC&V 2 -20 -13 <br />Process Parts Bldg. 40 ft 40 ft 14 ft 22.400 cf $0.33 $7.392 ICM Ltr. to <br />(Pre -Fab Steel Structure) 7.. Porter of <br />CC' &V 2 -20 -13 <br />Should you require any additional information please contact me at the letterhead address. "Thank you. <br />Sincereh, <br />fi4„, <br />Michael D. Ellis. P.E. <br />'Means heavy Construction Cost Data for 2012, page 37 <br />303- 279 -8532 <br />eeeoscar(a`att.net <br />"Total Direct Cost = $12,197 <br />DRMS Admin Tees (22.55 %) =5 2.750 <br />Grand Total Demolition Cost = $14,947 <br />
The URL can be used to link to this page
Your browser does not support the video tag.