My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-04-05_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:12 PM
Creation date
4/5/2013 12:46:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
4/5/2013
Doc Name
Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN6
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 18 of 149 <br />Struck Volume: <br />35.00 <br />LCY <br />Heaped Volume: <br />46.50 <br />LCY <br />Average Volume: <br />40.75 <br />LCY <br />Adjusted Volume: <br />42.25 <br />LCY <br />Truck Ownership: <br />Final Truck <br />Volume Based on Number of Loader Passes: 40.48 <br />Loading Tool Capacity <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Bucket Size Class: NA <br />Rated Capacity: <br />9.200 <br />(Cat HB) <br />LCY (heaped) <br />Bucket Fill Factor: <br />1.100 <br />Other - rock /dirt mixtures (100 - 120°/x) 1.100 <br />Adjusted Capacity: <br />10.120 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 5700 feet <br />Net Correction: 0.830 0.830 <br />Loadins Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 minutes <br />LCY <br />4 passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loadins Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 minutes <br />LCY <br />4 passes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material 3/4" to 6" diameter 0.00 <br />0.000 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.080 minutes <br />0.495 minutes <br />1.585 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.70 Minutes Adjusted for site altitude: 0.700 Minutes <br />Truck Load Time: 1.585 Minutes Adjusted for site altitude: 1.585 Minutes <br />Truck Maneuver and Dump Time: 1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt /lt. surfaced, watered, <br />maintained 3.0 <br />CIRCES Cost Estimating Sofiivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.