Laserfiche WebLink
TRUCK /LOADER TEAM WORK <br />Task description: Haul boxcut spoil (Nt. Nucla) to pit <br />Site: New Horizon Mine Permit Action: Permit Renewal 6 Permit /Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 05C State: Colorado Abbreviation: None <br />Date: 12/18/2012 County: Montrose Filename: C008 -05c <br />User: SLB <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />Descripti <br />Truck Loader Team - Truck: Cat 773F <br />- Loader: CAT 988H <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck /Loader Team Sunnort F,ouinment Maintenance Equipment <br />Total work team cost /hour: $1,028.89 <br />MATERIAL OUANTITIES <br />Initial volume: 79,529 CCY Swell factor: 1.165 <br />Loose volume: 92,651 LCY <br />Source of estimated volume: Operator estimate of stockpile volume <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />75 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$60.64 <br />$82.23 <br />NA <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$119.47 <br />$87.77 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$25.66 <br />$35.82 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$205.77 <br />$205.81 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $1,028.89 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost /hour: $1,028.89 <br />MATERIAL OUANTITIES <br />Initial volume: 79,529 CCY Swell factor: 1.165 <br />Loose volume: 92,651 LCY <br />Source of estimated volume: Operator estimate of stockpile volume <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: <br />2,900 <br />Pounds /LCY <br />Description: <br />Decomposed rock - <br />50% Rock, 50% Earth <br />Rated Payload: <br />122,520 <br />Pounds <br />Payload Capacity: <br />42.25 <br />LCY <br />Truck Bed (volume) Basis: <br />