Laserfiche WebLink
Page 19 of 149 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( ° /o) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( ° /a) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />4000.00 <br />-1.30 <br />3.00 <br />1.70 <br />3448 <br />1.655 <br />2 <br />10000.00 <br />-1.30 <br />3.00 <br />1.70 <br />3448 <br />2.900 <br />Haul Time: 4.555 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( ° /o) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( ° /a) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />10000.00 <br />1.30 <br />3.00 <br />4.30 <br />3540 <br />3.087 <br />2 <br />4000.00 <br />1.30 <br />3.00 <br />4.30 <br />3540 <br />1.130 <br />Loading Tool unit <br />Production 1,062.93 <br />Truck Unit Production <br />Optimal No. of Trucks: 5 <br />Return Time: 4.217 <br />Total Truck Cycle Time: 12.157 <br />LCY /Hour Adjusted for job efficiency: <br />LCY /Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 663.29 <br />Adjusted single truck /loader team production: 663.29 <br />Adjusted multiple truck /loader team production: 663.29 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $1.551 /LCY Total job cost: <br />minutes <br />minutes <br />882.23 LCY /Hour <br />165.82 LCY /Hour <br />4 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />139.68 Hours <br />5143,719.92 <br />CIRCES Cost Estimating Sofiivare <br />