My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-02_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-04-02_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:05 PM
Creation date
4/3/2013 11:03:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/2/2013
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR135
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Re- topsoil GVB B13C -1 <br />Site: Bowie No. 2 Mine Permit Action: Minor Revision 135 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 341 <br />Date: 4/2/2013 <br />User: SLB <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C083 -341 <br />HOURLY EQUIPMENT COST <br />(AVG.) <br />1.000 <br />Basic Machine: Cat D9T - 9SU <br />1.000 <br />(GEN.) <br />Horsepower: 405 <br />(AVG.) <br />0.830 <br />Blade Type: Semi - Universal <br />0.800 <br />(FND -RF) <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost /Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,537 <br />Swell factor: 1.125 <br />Loose volume: 1,729 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />DRMS - 0.75' over 1.27 ac <br />Cat Handbook <br />100 feet <br />1,243.2 LCY/hr <br />Consolidated stockpile 1.0 <br />20% <br />7,725 feet <br />2,550 lbs /LCY <br />Weight description: Earth - Dry hacked <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Source <br />0.750 <br />(AVG.) <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.