Laserfiche WebLink
Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2152 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />267.54 LCY/hr <br />267.54 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.932/LCY <br />Total job time: <br />Total job cost: <br />13.39 Hours <br />$3,338.67 <br />CIRCES Cost Estimating Software <br />