Laserfiche WebLink
Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2448 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />304.34 LCY /hr <br />304.34 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.820 /LCY <br />Total job time: <br />Total job cost: <br />5.68 Hours <br />$1,417.10 <br />CIRCES Cost Estimating Software <br />