My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-20_GENERAL DOCUMENTS - C2009087
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2009087
>
2013-02-20_GENERAL DOCUMENTS - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:22 PM
Creation date
2/25/2013 11:24:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
General Documents
Doc Date
2/20/2013
Doc Name
Midterm Permit Review Findings (MT-1)
From
DRMS
To
Peabody Sage Creek Mining, LLC
Permit Index Doc Type
Findings
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering, and Project Management costs. Overhead and Profit costs consist of Liability <br />Insurance (% of direct cost), Performance Bond (% of direct cost), Job Superintendent (hourly), <br />and Profit (% of direct cost) which make up the Contract Amount (direct cost + Overhead and <br />Profit). The Legal, Engineering, and Project Management Costs consist of Engineering Work (% <br />of contract amount), and Reclamation Management (% of contract amount) for a Total Indirect <br />Cost of $1,005,015.24. <br />SECTION IV — MIDTERM ADEQUACY QUESTIONS <br />Pursuant to 2.08.3, the Division finds that the permit application C- 2009 -087 contains seventeen <br />deficiencies following the review for the purpose of fulfilling the requirements of the Colorado <br />Surface Coal Mining Reclamation Act, and the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining. The Division requests that the permittee correct the <br />deficiencies by submission of revised permit pages under appropriate revision applications, or by <br />activities on the ground, by March 29, 2013. <br />Item 1: Rule 2.01, Page 2.01 -1, Sections 2.01.3 and 2.01.5 identifies Sage Creek Coal Company, <br />LLC and references "SCCC" being used throughout the PAP. Please revise to reflect the name <br />of the current permittee operator. <br />Item 2: "Note to Reviewer" information at the beginning of each section of the permit <br />requires page numbers to ensure proper pagination throughout the document. <br />Item 3: Rule 2.03. Page 2.03 -10, Section 2.03.4(1 -9) #2 identifies a Mr. Mike Ludlow as the <br />applicant /mine manager. Please revise this information to reflect the current applicant of the <br />Peabody Sage Creek Mine. <br />Item 4: Rule 2.03. Pages 2.03 -12 and 14, Map 2.03.4M!, and Exhibit 2.03.4 -E5 identifies Cross <br />Mountain Ranch as a landowner. The Division understands that this may not be the case in areas <br />adjacent to the mine permit and possibly within the permit. Please revise and update any <br />landowner information as it pertains to Rule 2.03.4(6). <br />Item 5: Edit. Approved permit page 2.04 -7 text does not transition to approved page 2.04 -8. <br />Please revise the text to ensure all required information is included. <br />Item 6: Page 2.04 -60 and Table 2.04.7 -T4 discusses Groundwater Rights and Use. Please <br />ensure that the information presented is current or provide revised information for <br />incorporation into the permit. <br />Item 7: Page 2.04 -67 lists surface water Site SSLG5 and reference to Map 2.04.7 -M1. Site <br />SSLG5 was not identified on approved Map 2.04.7 -M1. Please validate the location or revise <br />Map 2.04.7 -MI to include Site SSLG5. <br />Item 8: Edit. Approved permit page 2.04 -106 text does not transition to approved page 2.04- <br />106.1. Please revise the text to ensure all required information is included. <br />Peabody Sage Creek Mine -5- 2/20/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.