MR -12 <br />10/09/2012 <br />Water and Gas Line Geotechnical <br />No Change <br />Study <br />MR -13 <br />10/26/2012 <br />Acreage Discrepancies <br />No Change <br />MR -14 <br />10/17/2012 <br />Wadge Pond Pump Facilities <br />+$8,485.63 <br />MR -15 <br />10/24/2012 <br />Dewatering Well <br />No Change <br />MR -16 <br />11/29/2012 <br />Small Area Exemption <br />No Change <br />TR -01 <br />03/21/2011 <br />Portal Area Facility Modification <br />+ $491,972.00 <br />TR -02 <br />05/24/2011 <br />Hydrology Monitoring Plan <br />No Change <br />Changes <br />TR -03 <br />05/19/2011 <br />Name Change <br />Withdrawn <br />TR -04 <br />06/08/2012 <br />Facilities and Disturbance Area <br />+ $23,228.14 <br />Update <br />TR -05 <br />08/03/2012 <br />Reference Area Update <br />No Change <br />SO -1 <br />07/14/2011 <br />Transfer of Operators <br />SECTION III <br />— STATUS OF STIPULATIONS <br />No stipulations have been associated or added to Permit C- 2009 -087 since the issuance of the <br />permit. <br />SECTION V — PERMIT VARIANCES AND SPECIFIC APPROVALS <br />The Foidel Creek Mine permit does not include a variance under Rules 2.06.2 (experimental <br />practices), 2.06.3 (mountaintop removal), and 2.06.5 (approximate original contour (AOC) for <br />steep slope mining). No variance from contemporaneous reclamation for combined surface and <br />underground mining operations (2.06.7) is needed due to the Seneca 11 Mine ceased operations in <br />1999 and has been reclaimed, the excavated pit accessing the Wadge Seam to construct mine <br />portals and other facilities to support an underground mine is not considered surface mining, and <br />the Peabody Sage Creek Mine reclamation bond includes any remaining facilities from the <br />Seneca II Mine. <br />SECTION VI — BONDING SUMMARY <br />A compiled reclamation cost estimate was developed by the Division as a part of the Permit <br />Application process on May 7, 2010. The Division's reclamation costs have not been updated <br />since that date. However, a summary of those costs in addition to any revision adjustments has <br />been completed for this 2013 Midterm Review. As of February 20, 2013, the Division estimates <br />liability at the Foidel Creek Mine is $4,954,779.34. This amount is sufficient to assure <br />completion of the remaining reclamation work at the site if the work had to be performed by the <br />Division, including the cost of re- establishing vegetation on any revegetated areas, should those <br />areas fail. The permittee currently has on deposit with the Division one cash bond in the amount <br />of $6,160,431.65. <br />Based on the updated costs of associated revisions the direct costs for all reclamation tasks is <br />$3,949,764.10. This is less that the direct costs of $4,735,596, calculated for the Peabody Sage <br />Creek Mine upon approval. Indirect costs consist of the Overhead and Profit costs and the Legal, <br />Peabody Sage Creek Mine -4- 2/20/2013 <br />