Laserfiche WebLink
January 9, 2013 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />application for the unauthorized disturbance between Gob Piles #2 and #4, and failure to obtain final approval for <br />a revision prior to its implementation. The Division is currently reviewing a technical revision application (TR- <br />76) that would provide for expansion of Gob Pile #2. Final approval for the revision has not yet been granted, but <br />disturbance proposed under the revision had commenced. <br />A roadway had been constructed across an area not approved for disturbance. The operator indicated the roadway <br />was utilized to access rip rap for the East and West Diversion ditches that were previously approved for <br />construction. The disturbance is approximately 400' in length and 130' wide, totaling roughly 1.2 acres. <br />Nk Y <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 12 <br />Figure at left depicts currently approved <br />Gob Pile #2 configuration. Blue line <br />indicates location of diversion ditch <br />approved in Minor Revision No. 132 <br />Figure at left depicts proposed Gob Pile <br />#2 expansion area currently under <br />review with Technical Revision No. 76 <br />