My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-17_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-01-17_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:11 PM
Creation date
2/22/2013 1:23:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/17/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Jim Stover
Type & Sequence
RN3
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 9 of 299 <br /> <br />BULLDOZER WORK <br /> Task description: Regrade D-Portal Bench Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION Task #: 002 State: Colorado Abbreviation: None <br />Date: 1/16/2013 County: Delta Filename: C083-002 <br />User: SLB Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Basic Machine: Cat D10T - 10SU Horsepower: 574 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day Data Source: (CRG) Cost Breakdown: <br /> Utilization % Ownership Cost/Hour: $99.15 NA <br />Operating Cost/Hour: $183.36 100 Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $37.41 NA Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $1,279.71 MATERIAL QUANTITIES Initial Volume: 260,593 <br />Swell factor: 1.165 <br />Loose volume: 303,591 LCY Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION Average push distance: 100 feet Unadjusted hourly <br />production: <br />1,718.9 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: 10 % <br />Average site altitude: 6,900 feet <br /> Material weight: 2,900 lbs/LCY <br /> <br />Weight description: Decomposed rock - 50% Rock, 50% Earth Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.)
The URL can be used to link to this page
Your browser does not support the video tag.