Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 10 of 299 <br /> <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (FND-RF) <br />Push gradient: 0.786 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.793 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.2794 <br /> <br />Adjusted unit production: 480.26 LCY/hr <br />Adjusted fleet production: 1921.04 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) Unit cost: $0.666/LCY <br /> <br />Total job time: 158.03 Hours Total job cost: $202,238.29 <br /> <br />