Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 8 of 299 <br /> <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade (%) Roll. Res (%) Total Res (%) Velocity (fpm) <br />Travel Time (min) 1 600.00 17.00 3.00 20.00 379 1.588 Haul Time: 1.588 minutes <br />Return Route: Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) 1 600.00 -17.00 3.00 -14.00 1377 0.566 Return Time: 0.566 minutes <br />Total Truck Cycle Time: 7.474 minutes Loading Tool unit Production 600.89 LCY/Hour Adjusted for job efficiency: 498.74 LCY/Hour <br />Truck Unit Production <br />339.28 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />281.60 <br /> <br />LCY/Hour <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) Adjusted hourly truck team production: 563.20 LCY/Hour <br />Adjusted single truck/loader team production: 498.74 LCY/Hour <br />Adjusted multiple truck/loader team production: 498.74 LCY/Hour JOB TIME AND COST Fleet size: 1 Team(s) Total job time: 609.56 Hours <br /> Unit cost: $1.331 /LCY Total job cost: $404,650.02 <br />