My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-17_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-01-17_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:11 PM
Creation date
2/22/2013 1:23:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/17/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Jim Stover
Type & Sequence
RN3
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 8 of 299 <br /> <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade (%) Roll. Res (%) Total Res (%) Velocity (fpm) <br />Travel Time (min) 1 600.00 17.00 3.00 20.00 379 1.588 Haul Time: 1.588 minutes <br />Return Route: Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) 1 600.00 -17.00 3.00 -14.00 1377 0.566 Return Time: 0.566 minutes <br />Total Truck Cycle Time: 7.474 minutes Loading Tool unit Production 600.89 LCY/Hour Adjusted for job efficiency: 498.74 LCY/Hour <br />Truck Unit Production <br />339.28 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />281.60 <br /> <br />LCY/Hour <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) Adjusted hourly truck team production: 563.20 LCY/Hour <br />Adjusted single truck/loader team production: 498.74 LCY/Hour <br />Adjusted multiple truck/loader team production: 498.74 LCY/Hour JOB TIME AND COST Fleet size: 1 Team(s) Total job time: 609.56 Hours <br /> Unit cost: $1.331 /LCY Total job cost: $404,650.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.