Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 3 of 299 <br /> <br />097 Backfill and Regrade Gob Pile Pond D DOZER 1 8.18 $2,712.93 <br />098 Backfill and Regrade Pond F DOZER 1 10.87 $3,603.42 <br />099 Backfill and Regrade Pond J DOZER 1 20.29 $6,726.38 <br />100 Backfill and Regrade Pond K DOZER 1 1.52 $505.20 <br />101 Excavate for Post-mining Channel at B-Seam <br />Portals <br />EXCAVATE 2 0.63 $318.00 <br />102 Install Riprap, Gavel, and geotextile in BSeam <br />Channel <br />NA 1 72.59 $35,040.73 <br />110 Replace Topsoil from Stockpile A to Portal/Utility <br />Bench <br />SCRAPER1 1 652.39 $363,291.49 <br />111 Replace Topsoil from Stockpile A to Truck <br />Loadout/Coal Stkpl <br />SCRAPER1 1 42.52 $23,675.47 <br />112 Replace Topsoil from Stockpile F to Train Loadout SCRAPER1 1 39.98 $22,263.01 <br />113 Replace Topsoil from Stockpile A to B-Seam Portal Bench SCRAPER1 1 87.66 $48,814.27 <br />114 Replace Topsoil fm Stockpile to Freeman Gulch Vent Shaft Pad DOZER 4 0.93 $1,273.32 <br />115 Replace Topsoil fm Stockpiles C/D to Pond C and Gob Pond D SCRAPER1 1 13.12 $7,303.88 <br />116 Replace topsoil from Stockpile to Pond F DOZER 1 3.95 $1,350.55 <br />117 Replace topsoil from Stockpile F to Pond J SCRAPER1 1 2.85 $1,588.31 <br />118 Replace topsoil from Stockpile F to Pond K SCRAPER1 1 1.92 $1,067.77 <br />119 Replace topsoil fm stockpile to MR/TR Light-Use <br />Roads <br />DOZER 4 27.35 $37,359.60 <br />120 Replace topsoil from stockpiles to MR/TR drill <br />pads <br />DOZER 4 36.23 $48,046.47 <br />121 Replace topsoil from Stockpile A to Prep Plant <br />Bench <br />SCRAPER1 1 22.41 $12,479.57 <br />122 Replace topsoil from stockpile to Material Storage <br />Area <br />DOZER 4 0.18 $250.33 <br />123 Replace topsoil from Stockpile E to Gob Pile #2 SCRAPER1 1 28.82 $16,047.92 <br />124 Replace Topsoil from Stockpile to Gob Pile #2 SCRAPER1 1 69.19 $38,528.45 <br />125 Replace topsoil from stockpile to Gob Pile #3 SCRAPER1 1 132.68 $73,884.88 <br />126 Replace topsoil from stockpile to Haul Road DOZER 4 0.17 $228.58 <br />127 Replace topsoil from stockpile to Water Tank <br />Bench <br />SCRAPER1 1 1.71 $952.98 <br />128 Replace topsoil from Stockpile G to TR35 <br />road/pad <br />SCRAPER1 1 5.01 $2,791.77 <br />129 Replace topsoil from stockpile to Borrow Area DOZER 4 5.44 $7,434.02 <br />130 Replace topsoil fm stockpile to Upper Parking Lot Expansion DOZER 1 0.46 $148.25 <br />131 Replace topsoil fm stockpile to Hubbard Ck Vent Shaft Pad DOZER 4 0.74 $1,009.85 <br />140 Seal Portals and Shafts MINESEAL 1 40.00 $181,171.28 <br />141 Concrete Plug and Backfill Vent Shaft NA 1 40.00 $98,746.83 <br />142 Plug/Seal Boreholes BOREHOLE 1 1,502.00 $766,245.38 <br />150 Drill Seed Mix 3 on Disturbed Area REVEGE 1 40.00 $591,236.10 <br />151 Drill Seed Drill Pads REVEGE 1 60.00 $52,274.71 <br />152 Drill Seed Lt-Use Roads to Drill Pads and Terror <br />Creek <br />REVEGE 1 65.00 $60,052.61 <br />154 Broadcast Seed Mix 3 on Gob Pile #3 REVEGE 1 0.00 $131,843.93 <br />155 Drill seed Hubbard Creek Vent Shaft Pad REVEGE 1 0.00 $1,669.67 <br />156 Drill Seed Rock Laydown Area REVEGE 1 0.00 $278.28 <br />157 Weed Control Over 10-Year Liability Period REVEGE 1 0.00 $51,528.62 <br />165 Demolish and Remove all Structures DEMOLISH 1 80.00 $1,725,362.77 <br />170 Proctor Testing of Backfill NA 1 10.00 $689.85