Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 4 of 299 <br /> <br />171 Nuclear Density Testing of Backfill NA 1 1,760.00 $125,910.40 <br />172 Water Truck for Moisture Augmentation of Backfill Material MISCTRUK 1 1,437.02 $127,191.00 <br />173 Site Maintenance - Ten Years SITEMAINTENANCE 1 292.00 $238,012.40 <br />174 Support Equipment for Scraper Hauling SITEMAINTENANCE 1 449.16 $103,205.76 <br />180 Mobilize/Demobilize Equipment for First Construction Season MOBILIZE 1 12.00 $46,787.39 <br />181 Mobilize/Demobilize Equipment for Second Construction Season MOBILIZE 1 12.00 $46,787.39 <br />182 Mobilize/Demoblize Equipment for Pond Removal MOBILIZE 1 6.50 $4,574.19 <br />183 Mobilize/Demobilize Equipment for Yearly Site <br />Maintenance <br />MOBILIZE 1 14.00 $29,916.42 <br />241 Regrade Terror Creek Light-Use Road DOZER 1 29.73 $7,415.42 <br />242 Replace Topsoil from Stockpile to Terror Creek Lt-Use Road DOZER 1 22.45 $5,599.40 <br />252 Regrade BRL-1-03-01, 1-08-01, and 1-08-04 pads DOZER 1 5.51 $1,374.20 <br />253 Regrade Light-Use Roads BRL-1-03-01, -08-01, <br />and -08-04 <br />DOZER 1 23.45 $5,848.35 <br />254 Replace topsoil on BRL-1-03-01, -08-01, and -08- <br />04 pads <br />DOZER 1 1.61 $401.90 <br />255 Replace topsoil on LU Roads to BRL-1-03-01, - <br />08-01, & -08-04 <br />DOZER 1 10.63 $2,650.90 <br />256 Reseed BRL-1-03-01, -08-01, and -08-04 pads REVEGE 1 4.00 $1,285.74 <br />257 Reseed BRL-1-03-01, -08-01, and -08-04 LU roads REVEGE 1 16.00 $4,838.09 <br />261 Concrete plug and backfill Terror Creek vent shaft NA 1 40.00 $151,385.41 <br />278 Access Road Topsoil (9.08 acres - TR73) DOZER 1 43.32 $8,583.58 <br />279 Plug and seal 13 boreholes TR-73 BOREHOLE 1 156.00 $86,308.99 <br />280 Reseed Drill Pads (13 pads - TR-73) REVEGE 1 23.92 $32,425.71 <br />281 Reseed Access Roads - TR-73 REVEGE 1 18.16 $24,617.51 <br />282 Drill Pad backfill (13 pads TR-73) DOZER 1 123.24 $24,418.65 <br />283 Access Road Regrading (9.08 acres - TR73) DOZER 1 93.57 $18,538.40 <br />284 Drill Pad Topsoil (13 pads - TR73) DOZER 1 57.06 $11,305.14 <br />285 Regrade GVB-B13F Drill Pad DOZER 1 6.50 $1,621.35 <br />286 Regrade Light-Use Road to GVB-B13F DOZER 1 3.64 $908.09 <br />287 Replace Topsoil from Stockpile to GVB-B13F pad DOZER 1 2.60 $648.50 <br />288 Replace Topsoil from Stockpile to GVB-B13F Light-Use Road DOZER 1 1.07 $265.93 <br />289 Reseed GVB-B13F Drill Pad REVEGE 1 2.00 $1,280.08 <br />290 Reseed Light-Use Road to GVB-B13F REVEGE 1 2.00 $403.50 <br />299 Plug and Seal GVB-B13F BOREHOLE 1 48.00 $6,849.62 <br />300 Plug and Seal 4 Utility Holes at Fan Bench BOREHOLE 1 48.00 $14,649.86 <br />301 Reseed Add'l Disturbance from Utility Boreholes at Fan Bench REVEGE 1 1.00 $542.64 <br />302 Regrade Fan Bench - Utility Borehole Mudpit Add'l Dist. DOZER 1 4.06 $1,011.57 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> 13085.13 $8,725,299.84 <br /> INDIRECT COSTS OVERHEAD AND PROFIT: Liability insurance: 2.02% Total = $176,251.06