My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-17_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-01-17_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:11 PM
Creation date
2/22/2013 1:23:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/17/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Jim Stover
Type & Sequence
RN3
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 2 of 299 <br /> <br />035 Spread Uncompacted Refuse on Gob Pile #2 DOZER 4 68.14 $87,196.19 <br />036 Spread Uncompacted Refuse on Gob Pile #2 DOZER 4 86.77 $111,037.35 <br />037 Spread Uncompacted Refuse at Gob Pile #3 DOZER 4 99.16 $126,899.83 <br />038 Compact Material Hauled to Gob Pile #1 COMPACT 1 13.38 $1,877.00 <br />039 Compact Refuse on Gob Pile #2 COMPACT 1 153.51 $21,525.00 <br />040 Compact Refuse on Gob Pile #3 COMPACT 1 134.32 $18,834.00 <br />041 Compact Refuse at Gob Pile #3 COMPACT 1 148.39 $20,807.00 <br />042 Haul Top 1' from Stockpile Area to Gob Pile #1 SCRAPER1 1 14.59 $8,124.49 <br />043 Place 4' of Cover on Gob Pile #1 SCRAPER1 1 86.77 $48,317.67 <br />044 Replace Subsoil from Stockpile to Gob Pile #2 SCRAPER1 1 102.82 $57,257.50 <br />045 Replace Subsoil from Stockpile to Gob Pile #2 SCRAPER1 1 429.02 $238,906.47 <br />046 Place 1.6' of Cover on Gob Pile #3 SCRAPER1 1 101.00 $56,244.80 <br />050 Compact Backfilled D-Portal Bench,Roads, & <br />Utility Corridor <br />COMPACT 1 577.52 $80,975.00 <br />051 Compact Backfilled Material at Truck <br />Loadout/Coal Stockpile <br />COMPACT 1 63.35 $8,883.00 <br />052 Compact Backfilled Train Loadout COMPACT 1 215.94 $30,278.00 <br />053 Compact B-Seam Portal Bench COMPACT 1 128.72 $18,049.00 <br />054 Compact Backfilled Freeman Gulch Vent Shaft <br />Pad <br />COMPACT 1 1.83 $257.00 <br />060 Rip Utility Bench RIPPER 4 0.30 $423.00 <br />061 Rip D-Portal Bench RIPPER 4 3.71 $5,074.00 <br />062 Rip Truck Loadout/Coal Stockpile Area RIPPER 4 2.06 $2,819.00 <br />063 Rip Regraded Mine Area Prior to Topsoil Replacement RIPPER 4 59.09 $80,726.00 <br />064 Rip Train Loadout Facilities and Railbed Benches RIPPER 4 7.69 $10,509.00 <br />065 Rip B-Seam Portal Bench RIPPER 4 3.71 $5,074.00 <br />066 Rip Rock Laydown Pad Topsoil RIPPER 1 0.43 $147.00 <br />070 Rip Haul Roads (Portion Being Reclaimed) & Old <br />Truck Loadout <br />RIPPER 4 116.47 $159,846.00 <br />071 Remove Haul Road Subbase and Place on Gob Pile <br />#1 <br />SCRAPER1 1 30.54 $17,006.95 <br />072 Rip Truck Loadout Road RIPPER 4 2.14 $2,946.00 <br />073 Haul Truck Loadout Subbase to Gob Pile #1 SCRAPER1 1 12.75 $7,097.98 <br />074 Rip Upper Haul Road Asphalt Prior to Road <br />Narrowing <br />RIPPER 4 2.95 $4,050.00 <br />075 Pull Back/Haul Fill Mat'l from Upper Haul Rd <br />Narrowing <br />TRUCK1 1 141.47 $93,914.32 <br />076 Regrade Narrowed Section of Haul Road DOZER 4 26.11 $33,412.46 <br />077 Rip Gob Pile #1 Road RIPPER 4 2.35 $3,238.00 <br />078 Regrade Gob Pile #1 Road DOZER 4 5.17 $7,056.51 <br />079 Rip Access Road RIPPER 4 0.73 $1,011.00 <br />080 Haul Access Road Surface to Gob Pile #1 SCRAPER1 1 4.86 $2,705.66 <br />081 Regrade Access Road DOZER 4 1.79 $2,295.72 <br />082 Rip Freeman Gulch Vent Shaft Light-Use Road RIPPER 4 0.20 $287.00 <br />083 Backfill and Regrade Haul Road to Gob Pile #2 DOZER 4 0.44 $598.38 <br />084 Rip Lower Haul Road RIPPER 4 0.95 $1,304.00 <br />085 Regrade Lower Haul Road DOZER 4 36.46 $49,800.93 <br />086 Regrade Light Use Roads from MRs and TRs DOZER 4 83.60 $114,197.16 <br />090 Finish Grade Disturbed Mine Area GRADER 1 129.92 $17,754.00 <br />091 Finish Grade Train Loadout GRADER 1 16.91 $2,311.00 <br />092 Finish Grade B-Seam Portal Bench GRADER 1 6.91 $945.00 <br />093 Finish Grade Gob Pile #2 GRADER 1 16.37 $2,238.00 <br />095 Backfill and Regrade Pond B DOZER 1 7.63 $2,604.29 <br />096 Backfill and Regrade Pond C DOZER 1 11.61 $3,849.63
The URL can be used to link to this page
Your browser does not support the video tag.