Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Cost Summary <br />Site: Bowie No. 2 Mine <br />Permit <br />Action: Permit Renewal 3 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION Task #: 000 State: Colorado Abbreviation: None Date: 01/17/2013 County: Delta Filename: C083-000 <br />User: SLB Agency or organization name: DRMS TASK LIST (DIRECT COSTS) <br />Task Description Form Used Fleet Size Task Hours Cost <br />001 Pull back and Haul Portal Bench Fill Material to Cut Slope TRUCK1 1 609.56 $404,650.02 <br />002 Regrade D-Portal Bench DOZER 4 158.03 $202,238.29 <br />003 Pull up Material for Utility Corridor EXCAVATE 2 24.96 $12,597.00 <br />004 Regrade Utility Corridor DOZER 4 4.48 $5,735.37 <br />005 Rip and Regrade Material Storage Area at Gob Pile DOZER 4 1.73 $2,214.69 <br />006 Pull Back Material @ Old Truck Loadout Material Storage Area EXCAVATE 2 21.27 $10,734.00 <br />007 Regrade Old Truck Loadout Material Storage Area DOZER 4 8.21 $10,504.91 <br />008 Pull Back Material at Truck Loadout/Coal <br />Stockpile <br />EXCAVATE 2 147.57 $74,466.00 <br />009 Regrade New Truck Loadout and Coal Stockpile DOZER 4 32.38 $41,438.55 <br />010 Pull Material Back onto Train L/O Facil. and Railbed Benches EXCAVATE 2 431.74 $217,860.00 <br />011 Regrade Train Loadout Facilities and Railbed Benches DOZER 4 171.56 $219,545.68 <br />012 Backfill and Regrade Train L/O Overland Conveyor Corridor DOZER 4 5.62 $7,185.63 <br />013 Haul Fill from Upper Mat'l Strge Area to B-Seam Portal Bench SCRAPER1 1 82.40 $45,884.70 <br />014 Haul Fill fr Adj. Mat'l Storage Area to B-Seam Portal Bench TRUCK1 1 89.33 $57,762.63 <br />015 Backfill and Regrade B-Seam Portal Bench DOZER 4 38.70 $52,870.21 <br />016 Pull Material Back onto Freeman Gulch Vent Shaft <br />Bench <br />EXCAVATE 2 2.31 $1,169.00 <br />017 Push mat'l from Freeman Gulch Vent Shaft back to <br />Cut Slope <br />DOZER 4 0.48 $610.45 <br />018 Regrade Freeman Gulch Vent Shaft Pad DOZER 4 8.63 $11,049.96 <br />019 Regrade Drill Pads from MRs and TRs DOZER 4 87.79 $112,348.35 <br />020 Regrade Material Storage Area from TR-29 DOZER 4 0.48 $613.89 <br />021 Backfill and Regrade New Prep Plant Bench DOZER 4 36.99 $47,340.24 <br />022 Replace Fill from Material Storage Area to Water <br />Tank Bench <br />SCRAPER1 1 1.51 $841.42 <br />023 Regrade Borrow Area DOZER 4 19.14 $24,497.89 <br />024 Regrade Hubbard Creek Vent Shaft Pad DOZER 4 1.89 $2,414.81 <br />025 Regrade Upper Parking Lot Expansion Area EXCAVATE 1 3.65 $923.00 <br />026 Haul Mat'l from Bowie No. 1 Stkpl to Hubbard Crk Vent Shaft TRUCK1 1 26.68 $25,480.98 <br />027 Haul Rock to Vent Shafts for Disposal TRUCK1 1 10.50 $4,249.97