CIRCES Cost Estimating Software
<br />065 Construct Post-Mining Drainage Channels POSTMININ
<br />G
<br />1 2,749.40 $9,221,073.00
<br />070 Regrade Gulch A Pond DOZER 1 30.76 $7,994.36
<br />071 Regrade Prospect Pond DOZER 1 34.19 $8,885.41
<br />072 Regrade Streeter Pond DOZER 1 77.75 $20,203.92
<br />073 Regrade Gossard Loop Pond DOZER 1 2.28 $593.17
<br />074 Regrade Gossard Pond DOZER 1 0.99 $257.30
<br />075 Regrade Sewage and Aeration Pond DOZER 1 12.87 $3,344.01
<br />076 Regrade Stoker Siding Pond DOZER 1 7.52 $1,954.77
<br />077 Regrade Wash Bay Pond DOZER 1 38.23 $9,933.60
<br />078 Regrade Wash Bay Sediment Sump DOZER 1 1.78 $462.79
<br />079 Regrade Work Area Pond DOZER 1 134.18 $34,869.04
<br />080 Regrade Section 16 Pond DOZER 1 43.08 $11,195.91
<br />081 Regrade East Taylor Pond DOZER 1 19.87 $5,163.22
<br />082 Regrade Taylor Pond DOZER 1 7.77 $2,020.39
<br />083 Regrade West Pit Pond DOZER 1 55.40 $14,395.73
<br />084 Regrade Section 28 Pond DOZER 1 64.92 $16,869.41
<br />085 Regrade Section 21 Pond DOZER 1 48.59 $12,627.45
<br />086 Regrade West Taylor Pond DOZER 1 21.38 $5,556.08
<br />090 Remove and Regrade East Collection Ditch EXCAVATE 1 46.00 $7,161.00
<br />091 Remove and Regrade South Collection Ditch EXCAVATE 1 68.17 $10,612.00
<br />092 Remove and Regrade Streeter Ditch EXCAVATE 1 13.56 $2,111.00
<br />093 Remove and Regrade Prospect Collection Ditch EXCAVATE 1 11.52 $1,795.00
<br />094 Remove and Regrade North Facilities Ditch EXCAVATE 1 6.10 $950.00
<br />095 Remove and Stoker Ditch EXCAVATE 1 5.85 $911.00
<br />096 Remove and Regrade West Side Facilities Ditch EXCAVATE 1 24.42 $3,801.00
<br />097 Remove and Regrade East Taylor Pond Ditch EXCAVATE 1 10.85 $1,690.00
<br />098 Remove and Regrade West Pit Coal Road Ditch EXCAVATE 1 14.24 $2,218.00
<br />099 Remove and Regrade Section 16 Pond Ditch EXCAVATE 1 27.13 $4,225.00
<br />100 Remove and Regrade Section 16 Taylor Ditch EXCAVATE 1 12.89 $2,007.00
<br />101 Remove and Regrade Section 16 Perimeter Ditch EXCAVATE 1 14.92 $2,323.00
<br />102 Remove and Regrade Section 28 Collector Ditch EXCAVATE 1 15.87 $2,471.00
<br />103 Remove and Regrade Section 29 Collector Ditch EXCAVATE 1 22.36 $3,481.00
<br />104 Remove and Regrade Ten Sediment Traps EXCAVATE 1 349.16 $54,352.00
<br />105 Remove and Regrade Six Post-Mining Stock
<br />Ponds
<br />EXCAVATE 1 52.66 $8,198.00
<br />110 Haul Topsoil from Pile 10A to East Pit TRUCK1 2 2.66 $17,521.73
<br />111 Haul Topsoil from Pile 16A to East Pit TRUCK1 2 30.44 $227,345.36
<br />112 Haul Topsoil from Pile 16B to East Pit TRUCK1 2 9.18 $76,798.71
<br />113 Haul Topsoil from Pile 16B Windrow to East Pit TRUCK1 2 4.30 $32,100.08
<br />114 Haul Topsoil from Pile 4A to West Pit TRUCK1 2 16.79 $125,431.69
<br />115 Haul Topsoil from Pile 15B to West Pit TRUCK1 2 53.93 $402,804.22
<br />116 Haul Topsoil from Pile 15K to West Pit TRUCK1 2 9.05 $75,668.91
<br />117 Haul Topsoil from Pile 16A to West Pit TRUCK1 2 12.68 $94,704.57
<br />118 Haul Topsoil from Pile 16E to West Pit TRUCK1 2 4.52 $33,792.42
<br />119 Haul Topsoil from Windrow 5 to West Pit TRUCK1 2 4.93 $32,427.00
<br />120 Haul Topsoil from Stockpile 16D to Section 16 Pit TRUCK1 2 58.41 $436,261.87
<br />121 Haul Topsoil from Stockpile 16E to South Taylor
<br />Pit
<br />TRUCK1 2 103.95 $869,225.07
<br />122 Haul Topsoil from New Stockpile South Taylor Pit TRUCK1 2 12.29 $102,730.09
<br />123 Haul Topsoil from Stockpile 15A to Facilities Area TRUCK1 2 18.54 $138,449.92
<br />124 Haul Topsoil from Stockpile 15E to Facilities Area TRUCK1 2 0.41 $2,680.17
<br />125 Haul Topsoil from Stockpile 15F to Facilities Area TRUCK1 2 1.03 $6,797.98
<br />126 Haul Topsoil from Stockpile 15G to Facilities Area TRUCK1 2 3.17 $23,661.90
<br />127 Haul Topsoil from Stockpile 15H to Facilities Area TRUCK1 2 7.06 $46,389.31
<br />128 Haul Topsoil from Stockpile 15I to Facilities Area TRUCK1 2 1.24 $8,134.91
|