Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY WORK <br /> <br />Task description: Permit Renewal 06 Cost Summary <br />Site: Colowyo Coal Mine <br />Permit Action: Permit Renewal <br />06 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 1/10/2013 County: Moffat Filename: C019-000 <br />User: JRS <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task Hours Cost <br />001 Drill and Shoot West Pit Highwall - Cast Blast BLASTING 1 1,467.49 $1,290,442.21 <br />005 Doze Remaining East Pit Spoil DOZER 4 173.65 $320,450.64 <br />006 Load and Haul Spoil to Final East Pit TRUCK1 1 212.70 $825,952.52 <br />007 Doze Remaining West Pit Highwall DOZER 4 159.45 $294,246.63 <br />008 Doze Remaining West Pit Spoil DOZER 4 3,399.69 $6,273,780.41 <br />009 Load and Haul Spoil to West Pit TRUCK1 1 629.70 $2,445,292.90 <br />010 Doze South Taylor Pit Highwall DOZER 4 107.59 $198,542.94 <br />011 Doze Remaining South Taylor Pit Spoil DOZER 4 352.84 $651,130.59 <br />012 Load and Haul Spoil from East Taylor Fill to <br />South TayloPit <br />TRUCK1 2 5,398.25 $54,825,046.72 <br />013 Load and Haul Spoil from West Taylor Fill to <br />South TayloPit <br />TRUCK1 2 510.11 $4,021,129.07 <br />014 Regrade Main Facilities Area DOZER 4 149.56 $276,004.61 <br />015 Regrade Coal Stockpile Area DOZER 4 19.73 $36,404.99 <br />016 Regrade Gossard Loadout DOZER 4 2.66 $4,902.76 <br />017 Regrade Wilson Water Pipeline Area DOZER 4 14.01 $25,861.38 <br />025 Rip Remaining West Pit Highwall RIPPER 4 56.42 $107,608.00 <br />026 Rip Remaining South Taylor Pit Highwall RIPPER 4 31.56 $60,197.00 <br />027 Rip Facilities Area RIPPER 4 60.17 $114,768.00 <br />028 Rip Coal Stockpile Area RIPPER 4 10.36 $19,765.00 <br />029 Rip Gossard Loadout RIPPER 4 0.96 $1,841.00 <br />030 Rip Wilson Water Pipeline Area RIPPER 4 5.09 $9,710.00 <br />031 Rip Mine Access/Haul Road RIPPER 4 3.14 $6,002.00 <br />032 Rip MR-21 Dragline Walk Road RIPPER 4 4.21 $8,044.00 <br />033 Rip Gossard Loadout Road RIPPER 4 1.26 $2,406.00 <br />040 Narrow Access Road DOZER 4 3.65 $6,731.60 <br />041 Regrade MR-21 Dragline Walk Road DOZER 4 6.31 $11,642.98 <br />042 Regrade Gossard Loadout Road DOZER 4 1.70 $3,144.63 <br />043 Regrade Haul Road West DOZER 4 7.59 $14,001.73 <br />044 Regrade Haul Road North DOZER 4 1.79 $3,302.97 <br />045 Regrade West Side Haul Road DOZER 4 7.64 $14,096.87 <br />050 Finish Grade East Pit DOZER 4 20.65 $39,380.12 <br />051 Finish Grade West Pit DOZER 4 121.42 $231,576.82 <br />052 Finish Grade South Taylor Pit DOZER 4 110.67 $211,072.63 <br />053 Finish Grade Facilities Area DOZER 4 14.62 $27,891.74 <br />054 Finish Grade Coal Stockpile Area DOZER 4 1.26 $2,412.26 <br />055 Finish Grade Gossard Loadout DOZER 4 0.55 $1,055.36 <br />056 Finish Grade Wilson Water Pipeline Area DOZER 4 1.25 $2,382.11 <br />057 Finish Grade All Reclaimed and Narrowed Roads DOZER 4 2.43 $4,643.60