My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-10_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-01-10_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:57 PM
Creation date
2/22/2013 1:12:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/10/2013
Doc Name
Cost Estimate (Emailed)
From
Jim Stark
To
Rob Zuber
Type & Sequence
RN6
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />129 Haul Topsoil from Stockpile Gossard Loadout TRUCK1 2 0.33 $2,157.38 <br />130 Replace 48" of Topsoil on Aspen Study Area TRUCK1 2 9.86 $73,650.76 <br />131 Replace 48" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCK1 2 7.40 $55,235.22 <br />132 Replace 4" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCK1 2 0.62 $4,603.17 <br />133 Replace Topsoil from Stockpile to Gulch A Pond DOZER 1 14.13 $3,779.41 <br />134 Replace Topsoil from Stockpile to Prospect Pond DOZER 1 9.19 $2,456.94 <br />135 Replace Topsoil from Stockpile to Streeter Pond DOZER 1 14.84 $3,968.58 <br />136 Replace Topsoil from Stockpile to Gossard Loop <br />Pond <br />DOZER 1 1.77 $472.65 <br />137 Replace Topsoil from Stockpile to Gossard Pond DOZER 1 5.30 $1,417.35 <br />138 Replace Topsoil from Stockpile to Sewage and <br />Aeration Pond <br />DOZER 1 10.25 $2,740.41 <br />139 Replace Topsoil from Stockpile to Stoker Siding <br />Pond <br />DOZER 1 2.12 $566.94 <br />140 Replace Topsoil from Stockpile to Wash Bay Pond DOZER 1 12.72 $3,401.64 <br />141 Replace Topsoil from Stockpile to Wash Bay <br />Sediment Sump <br />DOZER 1 2.47 $661.23 <br />142 Replace Topsoil from Stockpile to Work Area <br />Pond <br />DOZER 1 13.43 $3,590.82 <br />143 Replace Topsoil from Stockpile to Section 16 Pond DOZER 1 16.25 $4,346.35 <br />144 Replace Topsoil from Stockpile to East Taylor <br />Pond <br />DOZER 1 6.01 $1,606.53 <br />145 Replace Topsoil from Stockpile to Taylor Pond DOZER 1 1.77 $472.65 <br />146 Replace Topsoil from Stockpile to West Pit Pond DOZER 1 10.95 $2,929.00 <br />147 Replace Topsoil from Stockpile to Section 28 Pond DOZER 1 8.83 $2,362.06 <br />148 Replace Topsoil from Stockpile to Section 21 Pond DOZER 1 8.83 $2,362.06 <br />149 Replace Topsoil from Stockpile to West Taylor <br />Pond <br />DOZER 1 8.83 $2,362.06 <br />150 Replace Topsoil from Stockpile to Collection <br />Ditches <br />EXCAVATE 1 679.71 $105,805.00 <br />160 Plug and Seal All Wells and Boreholes BOREHOLE 1 534.00 $258,511.48 <br />165 Reseed East Pit with Grazing Land Seed Mix - <br />Active Pit Area <br />REVEGE 1 545.00 $100,115.96 <br />166 Reseed East Pit with Sagebrush Steppe Seed Mix - <br />Active Pit <br />REVEGE 1 90.40 $27,896.45 <br />167 Reseed East Pit with Grazing Land Seed Mix - <br />Phase II Areas <br />REVEGE 1 420.90 $135,740.25 <br />168 Reseed West Pit with Grazing Land Seed Mix REVEGE 1 2,257.60 $414,718.86 <br />169 Reseed West Pit with Sagebrush Steppe Seed Mix REVEGE 1 400.00 $123,435.60 <br />170 Reseed Section 16 Pit with Grazing Land Seed <br />Mix - Phase II <br />REVEGE 1 394.60 $63,629.25 <br />171 Reseed South Taylor Pit with Grazing Land Seed <br />Mix <br />REVEGE 1 1,736.40 $318,974.94 <br />172 Reseed South Taylor Pit with Sagebrush Steppe <br />Seed Mix <br />REVEGE 1 400.00 $123,435.60 <br />173 Reseed Facilities Area with Grazing Land Seed <br />Mix <br />REVEGE 1 849.00 $155,960.45 <br />174 Reseed Coal Stockpile Area with Grazing Land <br />Seed Mix <br />REVEGE 1 60.20 $11,058.68 <br />175 Reseed Gossard Loadout with Grazing Land Seed <br />Mix <br />REVEGE 1 30.00 $5,510.97 <br />176 Reseed Wilson Water Pipeline Area with Grazing <br />Land Seed Mix <br />REVEGE 1 72.80 $13,373.29 <br />177 Reseed Dragline Walk Road with Grazing Land <br />Seed Mix <br />REVEGE 1 13.40 $2,461.57
The URL can be used to link to this page
Your browser does not support the video tag.