My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-15_PERMIT FILE - C1981020
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981020
>
2013-02-15_PERMIT FILE - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:14 PM
Creation date
2/22/2013 7:25:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Permit File
Doc Date
2/15/2013
Section_Exhibit Name
Tables 2.1-1 to 4.1-5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tnrck'Loader Worksheet Cont'd Task 4 005 Page 2 of 3 <br />Truck Bed (volume) Basis: <br />Struck Volume: 8.00 LCY <br />Heaped Volume: 10.00 LCY <br />Average Volume: 9.00 LCY <br />Adjusted Volume: 9.41 LCY <br />Final Truck Volume Based on Number of Loader Passes: 8.74 LCY <br />Loading Tool Capacity <br />Bucket Size Class: Large <br />Rated Capacity: 3.330 LCY (heaped) <br />Bucket Fill Factor: 0.875 Loose material - 1" and over 85 - 90 %) 0.875 <br />Adjusted Capacity: 2.914 LCY <br />Job Condition Corrections: Site Altitude (ft.): 5600 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA minutes <br />3 passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Material: <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA minutes <br />3 passes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stoc ile: <br />NA <br />NA <br />(Cat HB) <br />Truck Ownership: <br />NA <br />NA <br />Cat HB <br />Operation: <br />NA <br />NA <br />(Cat HB) <br />Dwnp Target: <br />NA <br />NA <br />(Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Truck Load Tune: 0.742 <br />Truck Maneuver and Dump Time: 0.80 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />NA minutes <br />0.321 minutes <br />0.742 minutes <br />Minutes Adjusted for site altitude: 0.500 Minutes <br />Minutes Adjusted for site altitude: 0.742 Minutes <br />Minutes Adjusted for site altitude: 0.800 Minutes <br />Road Condition: Firm, smooth, rolling dirt/It. surfaced, watered. <br />CIRCES Cost Estimating Software <br />Table 3.9 -6 -5- 10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.