Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Excavate Topsoil and Haul to Mine <br />Site: Munger Canyon Mine Permit Action: RN -6 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 7/16/2012 County: Garfield <br />User: BFB <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Truck Loader Team - Truck: Generic 8 -10 c , 6x4 <br />- Loader: Cat 336D L 10' -6" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Page 1 of 3 <br />Pennit/Job #: C1981020 <br />Abbreviation: None <br />Filename: CO20 -005 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost /hour: $359.32 <br />MATERIAL OUANTITIES <br />Initial volume: 1,539 CCY Swell factor: 1.165 <br />Loose volume: 1,793 LCY <br />Source of estimated volume: Opertor Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: 50.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />55 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$9.13 <br />542.44 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$49.72 <br />S42.81 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />S38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />S58.85 <br />$123.92 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $359.32 <br />Support: S0.00 <br />Maint: $0.00 <br />Total work team cost /hour: $359.32 <br />MATERIAL OUANTITIES <br />Initial volume: 1,539 CCY Swell factor: 1.165 <br />Loose volume: 1,793 LCY <br />Source of estimated volume: Opertor Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: 50.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 <br />Pounds/LCY <br />Description. Decomposed rock - <br />50% Rock, 50% Earth <br />Rated Payload: 27,280 <br />Pounds <br />Payload Capacity: 9.41 <br />LCY <br />CIRCES Cost Estimatine Software <br />Table 3.9 -6 -4- 10/12 <br />