Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(SSD -AC) <br />0.666 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2367 <br />Adjusted unit production: 201.81 LCY/hr <br />Adjusted fleet production: 201.81 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.990/LCY <br />Total job time: 38.65 Hours <br />Total job cost: $7,724.53 <br />CIRCES Cost Estimatine Software <br />Table 3.9 -6 -3- 10/12 <br />