My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-15_PERMIT FILE - C1981020
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981020
>
2013-02-15_PERMIT FILE - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:14 PM
Creation date
2/22/2013 7:25:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Permit File
Doc Date
2/15/2013
Section_Exhibit Name
Tables 2.1-1 to 4.1-5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Munger Canyon Mine <br />BULLDOZER WORK <br />Mine Road and Bench with Material from Task 001 <br />Permit Action: RN -6 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 7/16/2012 County: Garfield <br />User: BFB <br />Agency or organization name: DRMS <br />Page 1 of 2 <br />Pennit/Job #: C1981020 <br />Abbreviation: None <br />Filename: CO20 -002 <br />HOURLY EQUIPMENT COST <br />Initial Volume: <br />Basic Machine: Cat D8T - 8SU <br />Swell factor: <br />1.000 <br />Horsepower: 310 <br />7,800 LCY <br />Source of estimated volume: Operator Estimate <br />Blade Type: Seini- Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$58.56 <br />NA <br />Operating Cost/Hour: <br />$102.81 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38,49 <br />NA <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />7,800 <br />Swell factor: <br />1.000 <br />Loose volume: <br />7,800 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: N/A <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />852.6 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 15% <br />Average site altitude: 5,600 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />CIRCES Cost Estimatine Software <br />Table 3.9 -6 -2- 10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.