Laserfiche WebLink
Truckloader Worksheet Cont'd Task # 005 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( o <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />8730.00 <br />10.00 <br />3.00 <br />13.00 <br />834 <br />10.476 <br />Haul Time: 1OA76 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />8730.00 <br />-10.00 <br />3.00 <br />-7.00 <br />2938 <br />3.063 <br />Return Time: 3.063 <br />Total Truck Cycle Time: 15.581 <br />Loading Tool unit <br />Production 422.28 LCY/Hour Adjusted for job efficiency: _ <br />Truck Unit Production <br />33.66 LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 13 Truck(s) Selected Number of Trucks.- <br />Adjusted hourly truck team production: 111.76 <br />Adjusted single truck/loader team production: 111.76 <br />Adjusted multiple truck/loader team production: 111.76 <br />JOB TIME AND COST <br />Fleet size: 1 Teatn(s) <br />Unit cost: $3.215 /LCY <br />Total job time: 16.04 <br />Total job cost: $5,764.72 <br />rrunutes <br />minutes <br />350.49 LCY/Hour <br />27.94 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimatine Software <br />Table 3.9 -6 -6- 10/12 <br />