2013-02-20_REPORT - M1977300
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977300
>
2013-02-20_REPORT - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:22 PM
Creation date
2/21/2013 7:24:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REPORT
Doc Date
2/20/2013
Doc Name
Constr. Activity Actual Area Impact and Mitigation Progress Reports.
From
IRIS Mitigation and Design, Inc.
To
COE and DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t; IRIS <br />MITIGATION AND DESIGN, INC. <br />Environmental Consulting <br />comments in a letter to the USFWS dated October 25, 2011. <br />IRIS MITIGATION AND DESIGN, INC. <br />2022 Arapahoe Street <br />Golden, Colorado 80401 <br />Phone: 720 - 272 -1985 <br />bleisure@irismitigation.com <br />USFWS commented on the initial Biological Assessment whereby IRIS responded to the <br />The USFWS then prepared a Biological Opinion which became part of the USACE permit <br />requirements dated November 25, 2011. This 2012 Schwartzwalder Mine Actual Area Impact <br />Report updates the USACE and USFWS on the construction activities that were completed at <br />the Site in 2012 and is required as part of the USAGE permit and the USFWS Biological <br />Opinion. This report also describes what mitigation activities need to be completed as a result <br />of the actual area impact (some of which have been completed to- date). <br />Proiect Background <br />The overall Schwartzwalder Mine project had three distinct phases and the 2011 USACE permit <br />and 2012 construction activities conclude Phase 1 of the project. Construction of the permitted <br />upstream cut -off wall and installation of the 18 -inch pipeline was completed in April 2012. In <br />April 2012, the Ralston Creek irrigation system was installed. Additional fine tuning of the <br />Phase 1 cut -off wall, 18 -inch pipeline, and irrigation system installation was completed in May <br />2012. <br />Phase 2 of the project included the proposed construction of a downstream cut -off wall, and a <br />42 -inch temporary diversion pipeline, mostly above ground and around the Site. Based on more <br />recent data and technical information, Cotter does not believe that Phase 2 is prudent or <br />needed at this time. Therefore, Cotter believes that Phase 3 should be the next Phase at the <br />Schwartzwalder Mine to be considered for USACE permitting with USFWS consultation. <br />Schwartzwalder Mine Actual Area Impact Page 2 <br />January 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.