Laserfiche WebLink
Hot Mix Asphalt <br />Element <br />V Factor <br />W Factor <br />2.36 mm (No. 8) mesh and larger sieves <br />600 pm (No. 30) mesh sieve <br />75 pm (No. 200) mesh sieve <br />Gradation <br />Asphalt Content <br />In -place Density <br />Joint Density <br />2.80 <br />1.80 <br />0.80 <br />N/A <br />0.20 <br />1.10 <br />1.60 <br />N/A <br />N/A <br />N/A <br />15 <br />25 <br />45 <br />15 <br />CC &V PROJECT NO. SC -07 -002 <br />3 <br />REVISION OF SECTIONS 105 AND 106 <br />CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT <br />(LESS THAN 5000 TONS) <br />Regardless of QL, the maximum PF in relation to Pn is limited in accordance with Table 105 -3. <br />February 3, 2011 <br />As test results become available, they will be used to calculate accumulated QL and PF numbers for each <br />process. The process I /DP's will then be calculated and accumulated for each element and for the item. The <br />test results and the accumulated calculations will be made available to the Contractor upon request. <br />Numbers from the calculations will be carried to significant figures and rounded according to AASHTO <br />Standard Recommended Practice R -11, Rounding Method. <br />Evaluation of Work. When the PF of a process is 0.75 or greater, the finished quantity of work represented by <br />the process will be accepted at the appropriate pay factor. If the PF is less than 0.75, the Engineer may: <br />1. Require complete removal and replacement with specification material at the Contractor's expense; <br />or <br />2. Where the finished product is found to be capable of performing the intended purpose and the value of <br />the finished product is not affected, permit the Contractor to leave the material in place. <br />If the material is permitted to remain in place the PF for the process will not be greater than 0.75. When <br />condition red, as described in Section 106, exists for any element, resolution and correction will be in <br />accordance with Section 106. Material, which the Engineer determines is defective, may be isolated and <br />rejected without regard to sampling sequence or location within a process. <br />If removal and replacement is required because the joint density PF for a process is below 0.75, the <br />Contractor shall remove and replace the full lane width adjacent to and including at least 6 inches beyond the <br />visible joint line for the entire length of joint representing the process. If the lane removed is adjacent to <br />another joint, that joint shall also be removed to a point 6 inches beyond the visible joint line. When a single <br />joint density core is more than 2V outside the tolerance limits, the removal and replacement limits shall be <br />identified by coring the failing joint at 25 foot intervals until two successive cores are found to be 1V or less <br />below the minimum tolerance limit. If removal and replacement is required, the Contractor shall submit <br />documentation identifying the process to be used to correct the area in question in writing. The process will <br />be approved by the Engineer before commencing the corrective work. <br />Table 105 -2 <br />"W" AND "V" FACTORS FOR VARIOUS ELEMENTS <br />